Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
IEC TR 62786-104 Distributed energy resources connection with the grid - Part 104 Typical application scenarios of distributed PV systems
30.20 CD study/ballot initiated
Distributed energy resources connection with the grid - Part 2: Additional requirements for PV generation systems
60.00 Standard under publication
Distributed energy resources connection with the grid - Part 42: Technical requirements for voltage measurement used to control DER and loads
60.00 Standard under publication
Amendment 2 - Measurement procedures for materials used in photovoltaic modules - Part 1-4: Encapsulants - Measurement of optical transmittance and calculation of the solar-weighted photon transmittance, yellowness index, and UV cut-off wavelength
30.20 CD study/ballot initiated
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 2-1: Polymeric materials - Frontsheet and backsheet - Safety requirements
40.20 DIS ballot initiated: 12 weeks
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials
20.99 WD approved for registration as CD
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 8-1: Electrically conductive adhesive (ECA) - Measurement of material properties
20.99 WD approved for registration as CD
Measurement method for the output of electroshock weapons
50.00 Final text received or FDIS registered for formal approval
Thunderstorm warning systems - Protection against lightning
20.99 WD approved for registration as CD
Hybrid telecommunication cables - Part 1: Generic specification
30.20 CD study/ballot initiated
Hybrid telecommunication cables - Part 2: Indoor hybrid cables - Sectional specification
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 2 - Photovoltaic systems - Design qualification of solar trackers
40.20 DIS ballot initiated: 12 weeks
Photovoltaic systems – Part 1: Design qualification of horizontal single axis solar trackers
20.99 WD approved for registration as CD
Building intercom systems - Part 1-1: System requirements - General
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Building intercom systems - Part 1-2: System requirements - Building intercom systems using the internet protocol (IP)
50.99 FDIS or proof approved for publication
Building intercom systems - Part 3-1: Application guidelines - General
30.20 CD study/ballot initiated
Electric welding equipment - Assessment of restrictions related to human exposure to electromagnetic fields (0 Hz to 300 GHz) - Part 2: Arc welding equipment
30.60 Close of voting/ comment period
Reference conditions and procedures for testing industrial and process measurement transmitters - Part 1: General procedures for all types of transmitters
50.00 Final text received or FDIS registered for formal approval