Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electrical relays - Tests and measurements - Part 41: Tests and measurement procedures - Insulation coordination
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electrical relays - Tests and Measurements - Part 46: Impulse voltage test
40.99 Full report circulated: DIS approved for registration as FDIS
Electrical relays - Tests and measurements - Part 52: Coil overvoltage
50.00 Final text received or FDIS registered for formal approval
Electrical Relays - Tests and measurements - Part 55: Maximum load breaking capacity
40.20 DIS ballot initiated: 12 weeks
Fuse-links with DC rated voltage above 1500 V for the protection of DC circuits with short time constants
30.20 CD study/ballot initiated
Artificial Intelligence enabled Medical Devices - Computer assisted analysis software for pulmonary images - Algorithm performance test methods
40.20 DIS ballot initiated: 12 weeks
Reuse of PV modules and circular economy
40.99 Full report circulated: DIS approved for registration as FDIS
Gap Analysis on Standards Related to City Information Modelling and Urban Digital Twins
30.20 CD study/ballot initiated
Gap Analysis on Standards Related to City Information Modelling and Urban Digital Twins
30.20 CD study/ballot initiated
DC side harmonics & filtering in HVDC transmission systems
50.60 Close of voting. Proof returned by secretariat
Market Catalogue for Stable Grid Operation
50.00 Final text received or FDIS registered for formal approval
Specification for evaluation of renewable energy power forecasting results
20.99 WD approved for registration as CD
InterLink Converters (ILC) - Safety and Performance Requirements
20.99 WD approved for registration as CD
Germicidal equipment - Airborne microorganisms inactivation by Germicidal Ultraviolet (GUV) luminaires
30.60 Close of voting/ comment period
Germicidal equipment - Germicidal UV luminaires - Radiation safety
30.60 Close of voting/ comment period
Hardware-in-the-loop simulation test of power system stability control system
50.00 Final text received or FDIS registered for formal approval
Lifecycle-events: information models and services
20.99 WD approved for registration as CD
Application driven Communication Use Cases and Requirements
20.99 WD approved for registration as CD