Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Nanotechnologies - Structural characterization of graphene - Part 2: Chemical vapour deposition (CVD) grown graphene
50.99 FDIS or proof approved for publication
Internet of Things (IoT) - Interoperability for IoT systems - Part 1: Framework
40.60 Close of voting
Internet of Things (IoT) - Interoperability for IoT systems - Part 2: Transport interoperability
20.99 WD approved for registration as CD
Internet of things – Interoperability for IoT systems – Part 5: Behavioural and policy interoperability
40.20 DIS ballot initiated: 12 weeks
Artificial Intelligence – Functional Safety and AI – Part 1: Requirements
30.60 Close of voting/ comment period
Artificial Intelligence – Functional Safety and AI – Part 2: Guidance
30.60 Close of voting/ comment period
Artificial Intelligence – Functional Safety and AI – Part 3: Examples of application
30.60 Close of voting/ comment period
PWI TR 22F-18 Performance of power electronics transformer for flexible transmission and distribution system
00.00 Proposal for new project received
Performance of high-voltage direct current (HVDC) systems with line-commutated converters - Part 3: Dynamic conditions
20.99 WD approved for registration as CD
Method of real-time simulation modelling for high voltage direct current (HVDC) equipment
00.00 Proposal for new project received
Nanotechnologies - Structural characterization of graphene oxide flakes: thickness and lateral size measurement using AFM and SEM
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Test method for RCDs of different types connected in series in household and similar uses
10.60 Close of voting
Residual current operated circuit-breakers for household and similar uses for dc systems - Part 1: Residual current operated circuit breakers with integral overcurrent protection (DC-RCBOs)
00.00 Proposal for new project received
Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 3-2: System LL / Configuration LL EV Coupler
10.60 Close of voting
Switches for appliances - Part 1: General requirements
00.99 Approval to ballot proposal for new project
Energy Efficiency - Customer Energy Management Systems – 4-1: General requirements for switching devices intended for prosumer electrical installation (PEI) and similar uses
10.60 Close of voting
Information technology - Physical network security for the accommodation of customer premises cabling infrastructure and information technology equipment
50.60 Close of voting. Proof returned by secretariat
Fuse-links for road vehicles - Fuse-links with a rated voltage up to 1000V AC and 1500V DC
40.20 DIS ballot initiated: 12 weeks