DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Generic - Terminology and letter symbols related to optical measurement and evaluation

20.99 WD approved for registration as CD

TC 110 more

Electronic displays - Part 3-9: Evaluation of optical performance - Display sparkle contrast

20.99 WD approved for registration as CD

TC 110 more

HVDC Installations - Guidelines on Asset Management

30.20 CD study/ballot initiated

TC 115 more

Photovoltaic modules - Bypass diode - Thermal runaway test

20.99 WD approved for registration as CD

TC 82 more

Workplace atmospheres - Part 1: Gas detectors - Performance requirements of detectors for toxic gases

30.20 CD study/ballot initiated

TC 31 more

Workplace Atmospheres — Part 1: Gas detectors — Performance requirements of detectors for toxic gases

10.99 New project approved

ISO/TC 146/SC 2 more

Safety of machinery - Safety-related sensors used for the protection of persons

30.99 CD approved for registration as DIS

TC 44 more

Part 4-1: Guidance and interpretation – Medical electrical equipment and medical electrical systems employing a level of autonomy

10.20 New project ballot initiated

TC 62/SC 62A more

Medical electrical equipment -- Part 97: Particular requirements for basic safety and essential performance of respiratory home high-flow therapy equipment

10.20 New project ballot initiated

TC 62/SC 62D more

Power cables with Aluminum Conductor for rated voltages 1 kV and 3 kV

00.99 Approval to ballot proposal for new project

TC 18/SC 18A more

Proprioceptive Interaction

00.99 Approval to ballot proposal for new project

TC 100/TA 18 more

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part 1: Common equipment and equipment specific to Line-Commutated Converters

30.20 CD study/ballot initiated

TC 115 more

High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part2: Using voltage sourced converters

30.20 CD study/ballot initiated

TC 115 more

Sound system Equipment – Part 20: Microspeakers

20.99 WD approved for registration as CD

TC 100/TA 20 more

Piezoelectric sensors - Part 1: Generic specifications

50.00 Final text received or FDIS registered for formal approval

TC 49 more

Piezoelectric sensors - Part 2: Chemical and biochemical sensors

50.00 Final text received or FDIS registered for formal approval

TC 49 more

Piezoelectric sensors - Part 3: Physical sensors

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 49 more

UHV AC transmission systems - Part 201: UHV AC substation design

20.99 WD approved for registration as CD

TC 122 more