Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.60 Close of voting
Terms and Definition for standards incorporating power electronic conversion
30.20 CD study/ballot initiated
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 1: Medium voltage bushings with Um from 12 kV up to and including 52 kV and Ir from 630 A up to and including 3150 A
60.00 Standard under publication
Transformer bushings dimensional standardization - Part 2: High voltage bushings
30.60 Close of voting/ comment period
Lighting systems - Electro-mechanical interfaces - Part 1: Safety
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Lighting systems - Electro-mechanical interfaces - Part 2-1: Four-pin extra-low-voltage twist-lock interface Type ZB18
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.00 DIS registered
Floating photovoltaic power plants - Design guidelines and recommendations
20.99 WD approved for registration as CD
Shunt-connected active correction devices (ACD)
50.00 Final text received or FDIS registered for formal approval
Railway applications - System energy efficiency
50.00 Final text received or FDIS registered for formal approval
Calibration of the prompt fission neutron logging tools
40.99 Full report circulated: DIS approved for registration as FDIS
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
30.99 CD approved for registration as DIS
<p>CDD Database - Circuit-breakers and similar equipment for household use</p>
50.00 Final text received or FDIS registered for formal approval
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
30.99 CD approved for registration as DIS