DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL më tepër

Nuclear Power Plants - Instrumentation and control systems important to safety - Cable connector assemblies for harsh environment purposes

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 45/SC 45A më tepër

Guideline for the adjustment potential evaluation of demand side resources

50.00 Final text received or FDIS registered for formal approval

TC 8/SC 8B më tepër

RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria

30.60 Close of voting/ comment period

TC 36 më tepër

Communication Standards Mapping

30.60 Close of voting/ comment period

TC 65/SC 65C më tepër

Insulation monitoring device - Marine application example

50.60 Close of voting. Proof returned by secretariat

TC 18 më tepër

Robotics for electricity generation, transmission and distribution systems -Part 1-2: State-of-the art and standardization roadmap for electric power system robots

50.00 Final text received or FDIS registered for formal approval

TC 129 më tepër

Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection

30.60 Close of voting/ comment period

TC 129 më tepër

Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment

40.20 DIS ballot initiated: 12 weeks

TC 87 më tepër

Guidelines for the assessment of rodent resistance for optical fibre cables

50.60 Close of voting. Proof returned by secretariat

TC 86/SC 86A më tepër

Distributed energy resource aggregation business - Part 1: System architecture and service scenarios

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

SyC Smart Energy më tepër

Distributed Energy Resource Aggregation Business System - Part 2: Risk assessment and treatment

20.99 WD approved for registration as CD

SyC Smart Energy më tepër

Industrial networks – Ethernet-APL port profile / Ethernet-SPE profile specification

50.00 Final text received or FDIS registered for formal approval

TC 65/SC 65C më tepër

Testing of Artificial Intelligence / Machine Learning-enabled Medical Devices

30.60 Close of voting/ comment period

TC 62 më tepër

Power conditioners efficiency with partially shaded photovoltaic generators

20.99 WD approved for registration as CD

TC 82 më tepër

Railway applications - Cybersecurity

40.99 Full report circulated: DIS approved for registration as FDIS

TC 9 më tepër

Systems Reference Deliverable (SRD) Template for smart manufacturing use cases

50.00 Final text received or FDIS registered for formal approval

SyC SM më tepër

Maritime battery system - Part 1: Secondary lithium cells and batteries - Safety requirements

40.20 DIS ballot initiated: 12 weeks

TC 18 më tepër