DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CISPR/CIS/A më tepër

Amendment 1 - Fragment 1: 18 GHz - 40 GHz Instrumentation

40.00 DIS registered

CISPR/CIS/A më tepër

Amendment 1 - Fragment 2: Discontinuous Analyzers

40.99 Full report circulated: DIS approved for registration as FDIS

CISPR/CIS/A më tepër

Amendment 2 - Fragment 1: 18-40 GHz Antenna calibration sites and reference sites

20.99 WD approved for registration as CD

CISPR/CIS/A më tepër

Amendment 2 - Fragment 2: Calculable loop antennas

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Amendment 3 - Fragment 1: 18-40 GHz EMC antenna calibration

20.99 WD approved for registration as CD

CISPR/CIS/A më tepër

Amendment 3 - Fragment 2: Two homogenous antennas

20.99 WD approved for registration as CD

CISPR/CIS/A më tepër

Amendment 3 - Fragment 3: Calculable loop antennas

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Amendment 3 - Fragment 4: NSA

30.99 CD approved for registration as DIS

CISPR/CIS/A më tepër

Amendment 3 - Fragment 5: C-SAM

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Fragment 1: General Maintenance and CISPR history

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Fragment 2: Relationship of limits for SAC and FAR

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Fragment 3: Rationale for measurements and procedures for wired network port emissions

30.60 Close of voting/ comment period

CISPR/CIS/A më tepër

Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-4: The CISPR model for the calculation of limits for the protection of radio services

40.99 Full report circulated: DIS approved for registration as FDIS

CISPR/CIS/H më tepër

Small craft - Electric propulsion system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 18 më tepër

Medical devices — Sleep apnoea breathing therapy — Masks and application accessories

40.99 Full report circulated: DIS approved for registration as FDIS

TC 62/SC 62D më tepër

DC Rigid Gas-Insulated Transmission Line For Rated Voltage above 100kV

00.99 Approval to ballot proposal for new project

TC 17/SC 17C më tepër

Utility connections in port – Part 4: DC shore connection (DCSC) systems – General requirements

10.60 Close of voting

TC 18 më tepër