DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Road vehicles - Vehicle to grid communication interface - Part 4: Network and application protocol conformance test

30.99 CD approved for registration as DIS

TC 69 more

Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements

40.99 Full report circulated: DIS approved for registration as FDIS

CISPR/CIS/A more

Amendment 1 - Fragment 1: 18-40 GHz Instrumentation

30.99 CD approved for registration as DIS

CISPR/CIS/A more

Amendment 1 - Fragment 2: Discontinuous Analyzers

40.20 DIS ballot initiated: 12 weeks

CISPR/CIS/A more

Amendment 2 - Fragment 1: 18-40 GHz Antenna calibration sites and reference sites

20.99 WD approved for registration as CD

CISPR/CIS/A more

Amendment 2 - Fragment 2: Calculable loop antennas

30.60 Close of voting/ comment period

CISPR/CIS/A more

Amendment 3 - Fragment 1: 18-40 GHz EMC antenna calibration

20.99 WD approved for registration as CD

CISPR/CIS/A more

Amendment 3 - Fragment 2: Two homogenous antennas

20.99 WD approved for registration as CD

CISPR/CIS/A more

Amendment 3 - Fragment 3: Calculable loop antennas

30.60 Close of voting/ comment period

CISPR/CIS/A more

Amendment 3 - Fragment 4: NSA

30.99 CD approved for registration as DIS

CISPR/CIS/A more

Amendment 3 - Fragment 5: C-SAM

30.60 Close of voting/ comment period

CISPR/CIS/A more

Fragment 1: General Maintenance and CISPR history

30.60 Close of voting/ comment period

CISPR/CIS/A more

Fragment 2: Relationship of limits for SAC and FAR

30.60 Close of voting/ comment period

CISPR/CIS/A more

Fragment 3: Rationale for measurements and procedures for wired network port emissions

30.60 Close of voting/ comment period

CISPR/CIS/A more

Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-4: The CISPR model for the calculation of limits for the protection of radio services

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

CISPR/CIS/H more

Small craft - Electric propulsion system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 18 more

Utility connections in port – Part 4: DC shore connection (DCSC) systems – General requirements

10.60 Close of voting

TC 18 more

Information Technology–Home Electronic System–Guidelines for product interoperability–Part 3: Lexicon

40.60 Close of voting

ISO/IEC JTC 1/SC 25 more