Nuclear facilities - Instrumentation, control and electrical power systems important to safety - Structure of the IEC SC 45A standards series

50.00 Final text received or FDIS registered for formal approval

TC 45/SC 45A më tepër

Energy Efficiency - Customer Energy Management Systems -- Part 1: General Requirements and Architecture

50.00 Final text received or FDIS registered for formal approval

TC 23/SC 23K më tepër

Energy Efficiency Systems - Smart Grid - Customer Energy Management Systems - Interface between the Energy Management Gateway and BEM / CEM - Data model and messaging

20.99 WD approved for registration as CD

TC 23/SC 23K më tepër

Energy efficiency systems - Smart grid - Customer energy management systems - Interface between the home/building CEM and resource manager(s) - Data model and messaging

40.20 DIS ballot initiated: 12 weeks

TC 23/SC 23K më tepër

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

20.99 WD approved for registration as CD

TC 42 më tepër

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 3 më tepër

Generic RMS simulation models of inverter-based generators for power system dynamic analysis

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8/SC 8A më tepër

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

40.20 DIS ballot initiated: 12 weeks

TC 23/SC 23H më tepër

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

30.99 CD approved for registration as DIS

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 3: Basic operations

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

30.99 CD approved for registration as DIS

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 7: Information exchange

20.99 WD approved for registration as CD

TC 82 më tepër

Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification

40.60 Close of voting

TC 45/SC 45A më tepër

Artificial pollution tests on high-voltage insulators made of hydrophobicity transfer materials to be used on a.c. and d.c. systems

30.60 Close of voting/ comment period

TC 36 më tepër

Guidance and plan to develop smart energy ontologies

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks