Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Technical specification for black start of hydropower plant
30.20 CD study/ballot initiated
Nuclear facilities - Instrumentation, control and electrical power systems important to safety - Structure of the IEC SC 45A standards series
50.00 Final text received or FDIS registered for formal approval
Energy Efficiency - Customer Energy Management Systems -- Part 1: General Requirements and Architecture
50.00 Final text received or FDIS registered for formal approval
Energy Efficiency Systems - Smart Grid - Customer Energy Management Systems - Interface between the Energy Management Gateway and BEM / CEM - Data model and messaging
20.99 WD approved for registration as CD
Energy efficiency systems - Smart grid - Customer energy management systems - Interface between the home/building CEM and resource manager(s) - Data model and messaging
40.20 DIS ballot initiated: 12 weeks
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
20.99 WD approved for registration as CD
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Generic RMS simulation models of inverter-based generators for power system dynamic analysis
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
40.20 DIS ballot initiated: 12 weeks
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 3: Basic operations
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 7: Information exchange
20.99 WD approved for registration as CD
Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification
40.60 Close of voting
Artificial pollution tests on high-voltage insulators made of hydrophobicity transfer materials to be used on a.c. and d.c. systems
30.60 Close of voting/ comment period