DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Preparation of information for use (instructions for use) of products — Part 3: Specific provisions for complex systems

20.00 New project registered in TC/SC work programme

ISO/TC 10/SC 1 më tepër

Digital Interactive Fault Diagnosis Manual

20.99 WD approved for registration as CD

TC 3 më tepër

Preparation of instructions for use — Structuring, content and presentation — Part 4: Digital Interactive Fault Diagnosis Manual

20.00 New project registered in TC/SC work programme

ISO/TC 10/SC 1 më tepër

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments

00.99 Approval to ballot proposal for new project

TC 86/SC 86B më tepër

Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components

00.99 Approval to ballot proposal for new project

TC 86/SC 86B më tepër

Fibre optic interconnecting devices and passive components –performance standard–Part 181-02: Box for category C – Indoor controlled environment

10.20 New project ballot initiated

TC 86/SC 86B më tepër

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS –PERFORMANCE STANDARD –Part 181-07: Box for category A – Outdoor aerial environment

10.20 New project ballot initiated

TC 86/SC 86B më tepër

Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 7-11: Type MPO connector family for weakly coupled 4-core fibres – One fibre row 12 fibres wide

10.20 New project ballot initiated

TC 86/SC 86B më tepër

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 më tepër

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 më tepër

Wind Energy Generation Systems – Part 18: Design Guideline for Pitch Bearings

10.60 Close of voting

TC 88 më tepër

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00 Proposal for new project received

TC 88 më tepër

FIRE HAZARD TESTING - Part 12-1: Electric arc-based test methods - AC Electric arc ignition energy test method for materials (AC EAIEM)

10.20 New project ballot initiated

TC 89 më tepër

Guidelines for Coordinated Reactive Power and Voltage Control of Coupled Systems of Renewable Energy Generation and HVDC Transmission

10.20 New project ballot initiated

TC 8/SC 8A më tepër

Microgrid - Part 3-7: Technical requirements - Data center microgrid monitoring, control, and energy management system

10.60 Close of voting

TC 8/SC 8B më tepër

Decentralized multi-energy systems - Integration of Power-to-X (P2X) systems into decentralized energy systems - Part 2-1: General principles, framework, and use cases

10.60 Close of voting

TC 8/SC 8B më tepër

Virtual Power Plant - Part 4: Primary Frequency Regulation Functional Requirements and Specification

10.60 Close of voting

TC 8/SC 8B më tepër

Decentralized multiple energy systems Part 3-1-Technical Requirements: Energy Management System

10.20 New project ballot initiated

TC 8/SC 8B më tepër