Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Preparation of information for use (instructions for use) of products — Part 3: Specific provisions for complex systems
20.00 New project registered in TC/SC work programme
Preparation of instructions for use — Structuring, content and presentation — Part 4: Digital Interactive Fault Diagnosis Manual
20.00 New project registered in TC/SC work programme
FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments
00.99 Approval to ballot proposal for new project
Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components
00.99 Approval to ballot proposal for new project
Fibre optic interconnecting devices and passive components –performance standard–Part 181-02: Box for category C – Indoor controlled environment
10.20 New project ballot initiated
FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS –PERFORMANCE STANDARD –Part 181-07: Box for category A – Outdoor aerial environment
10.20 New project ballot initiated
Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 7-11: Type MPO connector family for weakly coupled 4-core fibres – One fibre row 12 fibres wide
10.20 New project ballot initiated
Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield
10.60 Close of voting
Wind Energy Generation Systems – Part 18: Design Guideline for Pitch Bearings
10.60 Close of voting
FIRE HAZARD TESTING - Part 12-1: Electric arc-based test methods - AC Electric arc ignition energy test method for materials (AC EAIEM)
10.20 New project ballot initiated
Guidelines for Coordinated Reactive Power and Voltage Control of Coupled Systems of Renewable Energy Generation and HVDC Transmission
10.20 New project ballot initiated
Microgrid - Part 3-7: Technical requirements - Data center microgrid monitoring, control, and energy management system
10.60 Close of voting
Decentralized multi-energy systems - Integration of Power-to-X (P2X) systems into decentralized energy systems - Part 2-1: General principles, framework, and use cases
10.60 Close of voting
Virtual Power Plant - Part 4: Primary Frequency Regulation Functional Requirements and Specification
10.60 Close of voting
Decentralized multiple energy systems Part 3-1-Technical Requirements: Energy Management System
10.20 New project ballot initiated