DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Asset administration shell for industrial applications - Part 4: Use cases and modelling examples

30.99 CD approved for registration as DIS

TC 65 më tepër

Asset Administration Shell for industrial applications – Part 5: Interfaces

30.20 CD study/ballot initiated

TC 65 më tepër

E-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters

40.20 DIS ballot initiated: 12 weeks

TC 125 më tepër

IEC TR 63282-101 LVDC systems: DC power distribution system for typical scenarios

30.60 Close of voting/ comment period

TC 8 më tepër

IEC TR 63282-102 LVDC systems: Technical report for low-voltage DC electric island power supply systems

40.99 Full report circulated: DIS approved for registration as FDIS

TC 8 më tepër

Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65 më tepër

Industrial-process measurement, control and automation – Smart Manufacturing – Part 4:Recommendations for the usage of new technologies

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65 më tepër

Energy Storage Power Converter (ESPC) Sub-System for use in Electrical Energy Storage Systems (EESS) - Part 3: Method of specifying the performance and test requirements

20.99 WD approved for registration as CD

TC 22/SC 22H më tepër

Semiconductor devices - Generic semiconductor qualification guidelines - Part 3: Guidelines for reliability qualification plans for power semiconductor module

40.60 Close of voting

TC 47 më tepër

Semiconductor devices - Guidelines for reliability qualification plans - Part 4: Early failure assessment

30.60 Close of voting/ comment period

TC 47 më tepër

High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline

20.99 WD approved for registration as CD

TC 115 më tepër

High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 2: Parameter lists

20.99 WD approved for registration as CD

TC 115 më tepër

Portable multimedia equipment – Determination of battery duration – Part 3: Wearable powered loudspeaker equipment

40.20 DIS ballot initiated: 12 weeks

TC 100/TA 19 më tepër

Sensing devices for non-intrusive load monitoring (NILM) systems

50.99 FDIS or proof approved for publication

TC 85 më tepër

Smart city use case collection and analysis - Water systems in smart cities - Part 2 : Use case analysis

50.00 Final text received or FDIS registered for formal approval

SyC Smart Cities më tepër

Smart city use case collection and analysis – Intelligent operations centre for smart cities – Part 1: High-level analysis

60.00 Standard under publication

SyC Smart Cities më tepër

Smart city use case collection and analysis - Intelligent operations center for smart cities - Part 2 : Use Case Analysis

40.99 Full report circulated: DIS approved for registration as FDIS

SyC Smart Cities më tepër

Measurement methods of the complex relative permeability and permittivity of noise suppression sheet

20.99 WD approved for registration as CD

TC 51 më tepër