Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Measurement methods of blue light characteristics and related optical performance for visual display terminals
20.99 WD approved for registration as CD
Switchgear and controlgear and their assemblies for low voltage - Security aspects
40.99 Full report circulated: DIS approved for registration as FDIS
Photovoltaic modules - Extended-stress testing - Part 1: Modules
20.99 WD approved for registration as CD
Durability test methods for electronic displays - Part 2-21: Environmental tests - Test methods for heat and humidity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Durability test methods for electronic displays - Part 2-23: Environmental tests - Outdoor weathering
60.00 Standard under publication
Durability test methods for electronic displays - Part 3-2: Mechanical tests - Static stress
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Durability test methods for electronic displays - Part 3-3:Mechanical tests - Dynamic stress
30.20 CD study/ballot initiated
Endurance test methods for die attach materials – Part 1: General specification
20.99 WD approved for registration as CD
Endurance test methods for die attach materials – Part 3: Power cycling test method for die attach materials applied to discrete type power electronic devices
30.60 Close of voting/ comment period
Endurance test methods for die attach materials – Part 5: Temperature cycling test methods for die attach materials (system soldering interconnection) applied to module type power electronic devices
40.60 Close of voting
Power quality management - Part 1: General guidelines
30.20 CD study/ballot initiated
IEC TR 63222-101 Power quality management - Part 101: Power quality data application
50.00 Final text received or FDIS registered for formal approval
Power quality management - Part 4: Harmonic analysis over public supply network
50.00 Final text received or FDIS registered for formal approval
Management of network assets in power systems - Overview, principles and terminology
30.99 CD approved for registration as DIS
Management of network assets in power systems - Risk-informed decision-making process
30.20 CD study/ballot initiated
Management of network assets in power systems - Management aspect
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks