DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Smart city use case collection and analysis – Smart urban planning for smart cities – Part 3: Industry viewpoint

20.99 WD approved for registration as CD

SyC Smart Cities more

Medical electrical equipment - Functional performance characteristics for X-ray-based image-guided radiotherapy equipment

30.20 CD study/ballot initiated

TC 62/SC 62C more

Automatic floor treatment machines for commercial use - Particular requirements

40.20 DIS ballot initiated: 12 weeks

TC 61/SC 61J more

Repurposing of secondary batteries - Part 2: Classification of batteries to be repurposed - Safety and performance estimation methods

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 21 more

Assessment of circular content in products - Part 3: Proportion of recycled materials (Proposed Horizontal Publication)

30.99 CD approved for registration as DIS

TC 111 more

Electronic displays for special applications - Part 4: Public information and signage

20.99 WD approved for registration as CD

TC 110 more

Electronic displays for special applications - Part 5: Review of relevance of display standards to automotive application

20.99 WD approved for registration as CD

TC 110 more

Low-voltage auxiliary power systems - Part 2-1: Design criteria - General requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

PC 127 more

Low-voltage auxiliary power systems - Part 2-2: Design criteria - Low-voltage DC auxiliary power systems for substations

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

PC 127 more

Smart city use case collection and analysis - Managing public health emergencies in smart cities - Part 2 : Use case analysis

50.60 Close of voting. Proof returned by secretariat

SyC Smart Cities more

Guideline for the planning and design of direct current or hybrid microgrids

20.99 WD approved for registration as CD

TC 8/SC 8B more

Performance of voltage sourced converter (VSC) based high-voltage direct current (HVDC) transmission - Part 2: Transient conditions

30.20 CD study/ballot initiated

TC 115 more

Performance of voltage sourced converter (VSC) based high-voltage direct current (HVDC) transmission - Part 3: dynamic conditions

20.99 WD approved for registration as CD

TC 115 more

Semiconductor devices - Semiconductor devices for IoT system - Part 2: Test method of semiconductor photon sources incorporating human factors for wearable equipment

30.60 Close of voting/ comment period

TC 47 more

Carbon footprint calculation applicable to industrial lithium-ion batteries - Part 1: General requirements and methodology

60.00 Standard under publication

TC 21/SC 21A more

Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages

40.20 DIS ballot initiated: 12 weeks

TC 47/SC 47D more

Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages

40.20 DIS ballot initiated: 12 weeks

TC 47/SC 47D more

Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device

50.99 FDIS or proof approved for publication

TC 47/SC 47D more