Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Systems Reference Document (SRD) Use Case Collection and Analysis: LVDC Systems for Public Electricity Distribution and distribution microgrids
20.99 WD approved for registration as CD
Cooking fume extractors - Methods for measuring the capture efficiency
40.99 Full report circulated: DIS approved for registration as FDIS
Electrical and electronic household and office equipment – Measurement of networked standby power of edge equipment
60.00 Standard under publication
Smart city system ontology – Part 2: Guidance on ontology management for smart cities
40.99 Full report circulated: DIS approved for registration as FDIS
Smart city system ontology – Part 4: Ontology for Positive Energy Districts
30.20 CD study/ballot initiated
Railway applications – Fixed installations – Coordination requirements and energy-saving performance evaluation for energy feedback equipment in DC traction systems
40.00 DIS registered
User’s Quality of Experience (QoE) on Multimedia Conferencing Services - Part 3: Measurement methods
50.99 FDIS or proof approved for publication
Assessment of Human Exposure to Electromagnetic Fields from Radiative Wireless Power Transfer Systems: Measurement and Computational Methods (Frequency Range of 30 MHz to 300 GHz)
20.99 WD approved for registration as CD
Accessibility Goals and Needs with an exemplar of use with a household voice control system
50.00 Final text received or FDIS registered for formal approval
Methods for spectral imaging performance evaluation of computed tomography
50.00 Final text received or FDIS registered for formal approval
Intelligent information request and delivery for digital information for use
30.60 Close of voting/ comment period
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.99 Full report circulated: DIS approved for registration as FDIS
Terms and Definition for standards incorporating power electronic conversion
30.60 Close of voting/ comment period
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 2: High voltage bushings
20.99 WD approved for registration as CD
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Interconnection of converter-based resources with power systems - Part 1: Grid connection requirements with bulk power systems
20.99 WD approved for registration as CD
Railway applications - System energy efficiency
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks