DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Key Performance Aspects for Smart Manufacturing

10.20 New project ballot initiated

TC 65/SC 65B more

Industrial networks – Fieldbus specifications – Part 2-0: Physical layer specification and service definition – General concepts and terminology

10.60 Close of voting

TC 65/SC 65C more

Industrial networks - Fieldbus specifications - Part 4-31: Data-link layer protocol specification - Type 31 elements

10.60 Close of voting

TC 65/SC 65C more

Industrial networks – Fieldbus specifications – Part 2-2: Physical layer specification and service definition – Type 2 elements

10.60 Close of voting

TC 65/SC 65C more

erezre

00.99 Approval to ballot proposal for new project

TC 65/SC 65C more

Vision on Communication Technologies

00.00 Proposal for new project received

TC 65/SC 65C more

Process Automation Device Information Model (PA-DIM) for integration in enterprise systems

00.99 Approval to ballot proposal for new project

TC 65/SC 65E more

Future IEC 63311 ED1: Permanent magnet (magnetically hard) materials - Method of measurement based upon the pulsed field magnetometry (PFM) technique

00.00 Proposal for new project received

TC 68 more

IEC Technical Report - Methods of measurement of the magnetic properties of non-oriented electrical steel strip and sheet by means of a small single sheet tester.

00.00 Proposal for new project received

TC 68 more

IEC Technical Report on studies of the measurements of the magnetic properties of electrical steels using a single sheet tester with magnetic field strength sensing H-coils

00.00 Proposal for new project received

TC 68 more

<p>Requirements of bidirectional wireless power transfer for electric vehicles</p>

10.20 New project ballot initiated

TC 69 more

Automatic electrical controls – Part 2-XX Particular requirements for Wireless Power Transfer Controls (WPTCs)

10.60 Close of voting

TC 72 more

Short-circuit current in d.c. systems – Part 0 Calculation of currents

10.60 Close of voting

TC 73 more

Pressure calculation for electrical installations with rated voltages above AC 1 kV and<br /> their installation rooms in the event of an arc fault

10.60 Close of voting

TC 73 more

IEC TR 63222-102 Power quality management - Part 102: Developing networks towards power quality standards

00.00 Proposal for new project received

TC 8 more

IEC TR 63222-103 Power quality management - Part 103: Distributed Generation Deployment with Power Quality Constraints

00.00 Proposal for new project received

TC 8 more

IEC 63222-XXX: Power Quality Management-Part×××: Analysis on Events influence Zone Over Public Supply Network (possible transformation in TS)

00.00 Proposal for new project received

TC 8 more

MARITIME SURVIVOR LOCATING SYSTEMS AND DEVICES (MAN OVERBOARD SYSTEMS), MINIMUM REQUIREMENTS, METHODS OF TEST AND REQUIRED RESULTS

00.99 Approval to ballot proposal for new project

TC 80 more