DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support

40.20 DIS ballot initiated: 12 weeks

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

40.20 DIS ballot initiated: 12 weeks

TC 82 more

Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

30.99 CD approved for registration as DIS

TC 87 more

Fixed accessories intended for household and similar purposes that supply power through an interface

40.60 Close of voting

TC 23/SC 23B more

Guideline for Switching Reliability Evaluation procedures for Gallium Nitride Power Conversion Devices

40.99 Full report circulated: DIS approved for registration as FDIS

TC 47 more

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL more

Guideline for the adjustment potential evaluation of demand side resources

50.60 Close of voting. Proof returned by secretariat

TC 8/SC 8B more

RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria

40.99 Full report circulated: DIS approved for registration as FDIS

TC 36 more

Communication Standards Mapping

30.60 Close of voting/ comment period

TC 65/SC 65C more

Robotics for electricity generation, transmission and distribution systems -Part 1-2: State-of-the art and standardization roadmap for electric power system robots

60.00 Standard under publication

TC 129 more

Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection

30.99 CD approved for registration as DIS

TC 129 more

Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — Part 3‑21: Overhead transmission line inspection robot - General requirements

20.99 WD approved for registration as CD

TC 129 more

Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3‑31: Land cable tunnel inspection robot - General requirements.

20.99 WD approved for registration as CD

TC 129 more

Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3-41: Wheeled lifting inspection robot for distribution substation General requirement, test methods and acceptance criteria

20.99 WD approved for registration as CD

TC 129 more

Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment

30.99 CD approved for registration as DIS

TC 87 more

Guidelines for the assessment of rodent resistance for optical fibre cables

50.00 Final text received or FDIS registered for formal approval

TC 86/SC 86A more