DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

50.00 Final text received or FDIS registered for formal approval

TC 82 më tepër

Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets

20.99 WD approved for registration as CD

TC 4 më tepër

Sustainable management of waste electrical and electronic equipment (e-waste) (Proposed Horizontal Publication)

50.60 Close of voting. Proof returned by secretariat

TC 111 më tepër

Black start of hydropower plant

50.60 Close of voting. Proof returned by secretariat

TC 4 më tepër

Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)

20.99 WD approved for registration as CD

TC 23/SC 23K më tepër

Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

50.00 Final text received or FDIS registered for formal approval

TC 23/SC 23K më tepër

Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)

20.99 WD approved for registration as CD

TC 23/SC 23K më tepër

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

40.00 DIS registered

TC 42 më tepër

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 3 më tepër

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

40.99 Full report circulated: DIS approved for registration as FDIS

TC 23/SC 23H më tepër

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

40.20 DIS ballot initiated: 12 weeks

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99 WD approved for registration as CD

TC 82 më tepër

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

40.20 DIS ballot initiated: 12 weeks

TC 82 më tepër

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 6: Power control functions and grid support

30.99 CD approved for registration as DIS

TC 82 më tepër

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

30.99 CD approved for registration as DIS

TC 82 më tepër

Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

30.20 CD study/ballot initiated

TC 87 më tepër

Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification

60.00 Standard under publication

TC 45/SC 45A më tepër