Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 5: EP-cores and associated parts for use in inductors and transformers
40.60 Close of voting
Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 9: Planar cores
40.60 Close of voting
Grid code compliance assessment methods for grid connection of wind and PV power plants
20.99 WD approved for registration as CD
Electrical installations in ships – Primary DC distribution, system design architecture
20.99 WD approved for registration as CD
Hydraulic turbines, storage pumps and pump-turbines – Hydraulic transient analysis, design considerations and testing
50.60 Close of voting. Proof returned by secretariat
Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality
20.99 WD approved for registration as CD
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance
30.60 Close of voting/ comment period
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety
30.60 Close of voting/ comment period
Information exchange for electric vehicle charging roaming service - Part 1: General
60.00 Standard under publication
Information exchange for electric vehicle charging roaming service Part 3: Message structure
30.60 Close of voting/ comment period
Guidelines for qualifying PV modules, components and materials for operation at high temperatures
50.60 Close of voting. Proof returned by secretariat
Amendment 1 - Determination of inrush current characteristics of lighting products
50.00 Final text received or FDIS registered for formal approval
Application function blocks and logic diagrams for Upstream Oil & Gas processes – System Control Diagrams – Part 1: General principles
30.60 Close of voting/ comment period
Guidance for installation procedures and tolerances of hydroelectric machines – Part 7: Horizontal Generator
40.99 Full report circulated: DIS approved for registration as FDIS
Guidance for installation procedures and tolerances of hydroelectric machines – Part 8: Horizontal Francis Turbine
40.99 Full report circulated: DIS approved for registration as FDIS
Multi-channel radio frequency connectors - Part 4: Sectional specification for type L32-4 and L32-5 circular connectors
40.20 DIS ballot initiated: 12 weeks
Electroacoustics - Modular instrumentation for acoustical measurements
40.99 Full report circulated: DIS approved for registration as FDIS