Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Low-voltage switchgear and controlgear - Part 7-5: Ancillary equipment - Terminal blocks for aluminium conductors
20.99 WD approved for registration as CD
Calculation of thermally permissible short-circuit currents, taking into account non-adiabatic heating effects
20.99 WD approved for registration as CD
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
50.99 FDIS or proof approved for publication
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 4: Equipment for continuous in-line or on-line monitoring of radioactivity in process streams
50.99 FDIS or proof approved for publication
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
40.60 Close of voting
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Rules for Steam Turbine Thermal Acceptance Tests - Part5 Steam Turbines in Combined Heat and Power (CHP) / District Heating (DH) Cycles
20.99 WD approved for registration as CD
Functional design criteria for a safety parameter display system for nuclear power stations
30.60 Close of voting/ comment period
Nuclear power plants - Control rooms - Design
20.99 WD approved for registration as CD
Radio frequency and coaxial cable assemblies - Part 1-1: Guidance, additional specifications, and test methods for cable assemblies for reference measurements and test fixtures
20.99 WD approved for registration as CD
Amendment 1 - Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements
50.60 Close of voting. Proof returned by secretariat
Amendment 1 - Arc welding equipment - Part 7: Torches
30.60 Close of voting/ comment period
Medical electrical equipment - Medical electron accelerators - Functional performance characteristics
30.60 Close of voting/ comment period
Nuclear power plants - Instrumentation important to safety - Acoustic monitoring systems for detection of loose parts: characteristics, design criteria and operational procedures
30.20 CD study/ballot initiated
Evaluation methods for protection against risk of fire in electric tumble dryers
00.99 Approval to ballot proposal for new project
Amendment 1 - Electromagnetic compatibility (EMC) - Part 1-9: General - Evaluation of uncertainty for the measurement of harmonic current emissions
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 A per phase and not subject to conditional connection
30.60 Close of voting/ comment period