Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Photovoltaic modules - Bypass diode - Thermal runaway test
20.99 WD approved for registration as CD
Safety of machinery - Safety-related sensors used for the protection of persons
30.60 Close of voting/ comment period
Medical electrical equipment -- Part 2-xx: Part 2-XX : Particular requirements for basic safety and essential performance of non-invasive arterial tonometer equipment
10.60 Close of voting
Information technology - Brain-computer Interfaces - Overview of ethical and societal concerns
00.00 Proposal for new project received
TR IEC 62899-525-1 ED1 Printed electronics - Part 525-1: Quality Assessment - R2R printed NFC QR code label for anticounterfeiting
20.99 WD approved for registration as CD
Power cables with Aluminum Conductor for rated voltages 1 kV and 3 kV
00.99 Approval to ballot proposal for new project
Transmitting and receiving equipment for radiocommunication – Elemental components for transceivers –<br /> Part 1: Low phase-noise oscillator technologies using photonics techniques
00.99 Approval to ballot proposal for new project
Multimedia systems and equipment for vehicle –External Visual Systems of eHMI (external Human-Machine Interfaces) for Automated Vehicles<br /> - Part 1: General
20.99 WD approved for registration as CD
High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part 1: Common equipment and equipment specific to Line-Commutated Converters
20.99 WD approved for registration as CD
High voltage direct current (HVDC) power transmission – System requirements for DC-side equipment - Part2: Using voltage sourced converters
20.99 WD approved for registration as CD
Piezoelectric sensors - Part 1: Generic specifications
40.20 DIS ballot initiated: 12 weeks
Piezoelectric sensors - Part 2: Chemical and biochemical sensors
40.60 Close of voting
Piezoelectric sensors - Part 3: Physical sensors
40.20 DIS ballot initiated: 12 weeks
UHV AC transmission systems - Security and stability requirements for system planning and design
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
UHV AC transmission systems - Part 201: UHV AC substation design
20.99 WD approved for registration as CD
Evaluation of Lightning Protection Performance of UHV AC Transmission Lines
30.20 CD study/ballot initiated
UHV AC transmission systems - Part 301: On-site acceptance tests
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks