Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
UHV AC transmission systems - Part 401: Substation maintenance
50.00 Final text received or FDIS registered for formal approval
Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 3: Electrical safety requirements
20.99 WD approved for registration as CD
Amendment 1 - Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 3: Electrical safety requirements
60.00 Standard under publication
Mobile Remotely Controlled Systems (MRCS) for nuclear and radiological applications - Particular requirements for ground surveillance
40.60 Close of voting
Mobile remotely controlled systems for nuclear and radiological applications - Particular requirements for aerial surveillance
30.60 Close of voting/ comment period
MRCS for nuclear and radiological applications - Performance and test requirements for underwater vehicles
30.60 Close of voting/ comment period
<p>Residual current operated circuit-breakers for household and similar uses for dc systems - Part 2: Residual current operated circuit breakers without integral overcurrent protection (DC-RCCBs)</p>
30.60 Close of voting/ comment period
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems
30.60 Close of voting/ comment period
Switchgear and controlgear and their assemblies for low voltage - Environmental aspects
30.60 Close of voting/ comment period
Low-voltage docking connectors for removable energy storage units
40.60 Close of voting
Semiconductor devices - Non-destructive recognition criteria of defects in silicon carbide homoepitaxial wafer for power devices - Part 5: Test method for defects using X-ray topography
40.20 DIS ballot initiated: 12 weeks
Intelligent device management – Part 1: Concepts and terminology
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Household and similar electrical air cleaning appliances - Methods for measuring the performance - Part 1: General requirements
30.20 CD study/ballot initiated
Household and similar electrical air cleaning appliances - Method for measuring performance - Part 2-2: Particular requirements for determination of gas-phase pollutant reduction
40.20 DIS ballot initiated: 12 weeks
Household and similar electrical air cleaning appliances - Methods for measuring the performance - Part 2-3: Particular requirements for reduction of microorganisms
30.60 Close of voting/ comment period
Household and similar electrical air cleaning appliances - Methods for measuring the performance - Part 2-5: Particular requirements for determination of the performance change by loading with particles
30.60 Close of voting/ comment period
Household and similar electrical air cleaning appliances — Method for measuring performance — Part 2-2: Particular requirements for determination of gas-phase pollutant reduction
40.20 DIS ballot initiated: 12 weeks