Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Distributed energy resources connection with the grid - Part 2 Additional requirements for PV generation
50.00 Final text received or FDIS registered for formal approval
Distributed energy resources connection with the grid – Part 42 Requirements for voltage measurement used to control DER and loads
50.00 Final text received or FDIS registered for formal approval
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials
20.99 WD approved for registration as CD
Measurement method for the output of electroshock weapons
40.20 DIS ballot initiated: 12 weeks
Thunderstorm warning systems - Protection against lightning
20.99 WD approved for registration as CD
Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1: Crystalline silicon
60.00 Standard under publication
Hybrid telecommunication cables - Part 2: Indoor hybrid cables - Sectional specification
30.99 CD approved for registration as DIS
Amendment 2 - Photovoltaic systems - Design qualification of solar trackers
30.20 CD study/ballot initiated
Building intercom systems - Part 1-1: System requirements - General
40.20 DIS ballot initiated: 12 weeks
Building intercom systems - Part 1-2: System requirements - Building intercom systems using the internet protocol (IP)
40.20 DIS ballot initiated: 12 weeks
Electric welding equipment - Assessment of restrictions related to human exposure to electromagnetic fields (0 Hz to 300 GHz) - Part 2: Arc welding equipment
30.20 CD study/ballot initiated
Reference conditions and procedures for testing industrial and process measurement transmitters - Part 1: General procedures for all types of transmitters
40.60 Close of voting
Reference conditions and procedures for testing industrial and process measurement transmitters - Part 2: Specific procedures for pressure transmitters
40.60 Close of voting
Reference conditions and procedures for testing industrial and process measurement transmitters - Part 3: Specific procedures for temperature transmitters
40.20 DIS ballot initiated: 12 weeks
Environmental declaration - Part 1: Communication wires and cables - Product specific rules
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electric vehicle battery swap system - Part 2: Safety requirements
50.60 Close of voting. Proof returned by secretariat
<p>ELECTRIC VEHICLE BATTERY SWAP SYSTEM - Part 3: Specific requirements for battery swap system operating with handheld swappable battery systems</p>
30.20 CD study/ballot initiated
Electric motor-operated hand-held tools, transportable tools and lawn and garden machinery - Safety - Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks