DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Distributed energy resources connection with the grid - Part 2 Additional requirements for PV generation

50.00 Final text received or FDIS registered for formal approval

TC 8 more

Distributed energy resources connection with the grid – Part 42 Requirements for voltage measurement used to control DER and loads

50.00 Final text received or FDIS registered for formal approval

TC 8 more

Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials

20.99 WD approved for registration as CD

TC 82 more

Measurement method for the output of electroshock weapons

40.20 DIS ballot initiated: 12 weeks

TC 85 more

Thunderstorm warning systems - Protection against lightning

20.99 WD approved for registration as CD

TC 81 more

Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1: Crystalline silicon

60.00 Standard under publication

TC 82 more

Hybrid telecommunication cables - Part 2: Indoor hybrid cables - Sectional specification

30.99 CD approved for registration as DIS

TC 46/SC 46C more

Amendment 2 - Photovoltaic systems - Design qualification of solar trackers

30.20 CD study/ballot initiated

TC 82 more

Building intercom systems - Part 1-1: System requirements - General

40.20 DIS ballot initiated: 12 weeks

TC 79 more

Building intercom systems - Part 1-2: System requirements - Building intercom systems using the internet protocol (IP)

40.20 DIS ballot initiated: 12 weeks

TC 79 more

Electric welding equipment - Assessment of restrictions related to human exposure to electromagnetic fields (0 Hz to 300 GHz) - Part 2: Arc welding equipment

30.20 CD study/ballot initiated

TC 26 more

Reference conditions and procedures for testing industrial and process measurement transmitters - Part 1: General procedures for all types of transmitters

40.60 Close of voting

TC 65/SC 65B more

Reference conditions and procedures for testing industrial and process measurement transmitters - Part 2: Specific procedures for pressure transmitters

40.60 Close of voting

TC 65/SC 65B more

Reference conditions and procedures for testing industrial and process measurement transmitters - Part 3: Specific procedures for temperature transmitters

40.20 DIS ballot initiated: 12 weeks

TC 65/SC 65B more

Environmental declaration - Part 1: Communication wires and cables - Product specific rules

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 46 more

Electric vehicle battery swap system - Part 2: Safety requirements

50.60 Close of voting. Proof returned by secretariat

TC 69 more

<p>ELECTRIC VEHICLE BATTERY SWAP SYSTEM - Part 3: Specific requirements for battery swap system operating with handheld swappable battery systems</p>

30.20 CD study/ballot initiated

TC 69 more

Electric motor-operated hand-held tools, transportable tools and lawn and garden machinery - Safety - Part 1: General requirements

40.20 DIS ballot initiated: 12 weeks

TC 116 more