DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 3: Fittings

20.00 New project registered in TC/SC work programme

ISO/TC 138/SC 2 më tepër

Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 5: Fitness for purpose of the system

20.00 New project registered in TC/SC work programme

ISO/TC 138/SC 2 më tepër

Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 2: Definitions and descriptions

40.99 Full report circulated: DIS approved for registration as FDIS

ISO/TC 184/SC 5 më tepër

Risk assessment

00.00 Proposal for new project received

ISO/TC 85/SC 5 më tepër

Guidance for use in the application of ISO/IEC Guide 71:2014 — Part 2: Ergonomic design considerations

30.20 CD study/ballot initiated

ISO/TC 159 më tepër

Foil bearings — Performance testing of foil thrust bearings — Testing of static load capacity, bearing torque, friction coefficient and lifetime

40.20 DIS ballot initiated: 12 weeks

ISO/TC 123/SC 7 më tepër

Medical devices utilizing animal tissues and their derivatives — Part 3: Validation of the elimination and/or inactivation of viruses and transmissible spongiform encephalopathy (TSE) agents

10.99 New project approved

ISO/TC 194 më tepër

Use of reclaimed water in industrial cooling systems — Part 3: Guidelines for test simulation

10.60 Close of voting

ISO/TC 282/SC 4 më tepër

Geotechnical investigation and testing — Field testing — Part 1: Electrical cone and piezocone penetration test — Amendment 1

40.60 Close of voting

ISO/TC 182 më tepër

Corrosion of metals and alloys — Sulfur dioxide test in a humid atmosphere (fixed gas method)

40.99 Full report circulated: DIS approved for registration as FDIS

ISO/TC 156 më tepër

Non-destructive testing — Magnetic flux leakage testing — Corrosion of steel plates and steel pipes of in-service equipment

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 135/SC 2 më tepër

Plastics and rubber machines — Extruders and ancillary equipment - Safety requirements

30.20 CD study/ballot initiated

ISO/TC 270 më tepër

Design process of ventilative cooling systems — Part 1: Non-residential buildings

00.00 Proposal for new project received

ISO/TC 205 më tepër

Statistical methods in process management — Capability and performance — Part 1: General principles and concepts

10.99 New project approved

ISO/TC 69/SC 4 më tepër

Statistical methods in process management — Capability and performance — Part 5: Process capability estimates and performance for attributive characteristics

10.99 New project approved

ISO/TC 69/SC 4 më tepër

Statistical methods in process management — Capability and performance — Part 7: Capability of measurement processes

50.00 Final text received or FDIS registered for formal approval

ISO/TC 69/SC 4 më tepër

External limb prostheses and external orthoses — Requirements and test methods

40.60 Close of voting

ISO/TC 168 më tepër

Non-destructive testing — Visual testing with industrial endoscope — Part 1: Method

30.20 CD study/ballot initiated

ISO/TC 135/SC 2 më tepër