Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Industrial automation systems and integration — Ontology based interoperability — Part 1: Overview and fundamental principles
30.00 Committee draft (CD) registered
Automation systems and integration — Ontology based interoperability — Part 100: Schedule data ontology
30.60 Close of voting/ comment period
Automation systems and integration — Ontology based interoperability — Part 2: Vocabulary
30.60 Close of voting/ comment period
Automation systems and integration — Ontology based interoperability — Part 3: Industrial data ontology
50.00 Final text received or FDIS registered for formal approval
Surface chemical analysis — Atomic force microscopy — Guideline for restoration procedure for atomic force microscopy images dilated by finite probe size
00.00 Proposal for new project received
Fine ceramics (advanced ceramics, advanced technical ceramics) — Methods for chemical analysis of zirconium oxide powders
40.99 Full report circulated: DIS approved for registration as FDIS
Testing of gas phase air cleaners for improving perceived indoor air quality
20.00 New project registered in TC/SC work programme
Cosmetics — Answers to frequently asked questions on ingredients and product characterization according to ISO 16128-1 and ISO 16128-2
20.00 New project registered in TC/SC work programme
Protective clothing — Enhanced visibility warning clothing for medium risk situations — Test methods and requirements
30.99 CD approved for registration as DIS
Methodology for achieving non-residential zero-energy buildings (ZEBs)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — Marine environment protection — Specification for collecting data on ship's fuel oil consumption
40.99 Full report circulated: DIS approved for registration as FDIS
Rolling bearings — Parts library — Reference dictionary for rolling bearings and spherical plain bearings
40.60 Close of voting
Light and lighting — Building information modelling properties for lighting — Daylight louver systems
20.60 Close of comment period
Intelligent transport systems – Motorway chauffeur systems (MCS) — Part 3: Requirements and test procedures for mandatory lane change
00.00 Proposal for new project received
Intelligent transport systems — Minimal risk manoeuvre (MRM) for automated driving — Part 2: Road shoulder stop — Minimum requirements and test procedures
20.00 New project registered in TC/SC work programme
Intelligent transport systems — Minimal Risk Maneuver (MRM) for automated driving — Part 2: Requirements and test procedures for stopping without lane change control
00.00 Proposal for new project received
Intelligent transport systems — Extracting trip data via nomadic device for estimating CO2 emissions — Part 3: Carbon footprint determination for trading emission reductions in eco-routing platforms
20.00 New project registered in TC/SC work programme