Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Intelligent transport systems — Minimal Risk Maneuver (MRM) for automated driving — Part 2: Requirements and test procedures for stopping without lane change control
00.00 Proposal for new project received
Intelligent transport systems — Extracting trip data via nomadic device for estimating CO2 emissions — Part 3: Carbon footprint determination for trading emission reductions in eco-routing platforms
20.00 New project registered in TC/SC work programme
Intelligent transport systems – Extracting trip data using nomadic and mobile devices for estimating CO2 emissions — Part 4: Estimation of greenhouse gas emissions in transport sectors
00.00 Proposal for new project received
Fire safety engineering – Concept and example applications of risk-based fire safety design of buildings
30.60 Close of voting/ comment period
Ships and marine technology — Ballast water management systems (BWMS) — Procedures for commissioning and testing BWMS using electrolytic methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Thermoset composite materials
30.60 Close of voting/ comment period
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 4: Thermoplastic composite materials
30.60 Close of voting/ comment period
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Unplasticized Polyamide (PA-U) material
10.99 New project approved
Road vehicles — Guidelines for the structure and layout of data communication standards
10.99 New project approved
Geometrical product specifications (GPS) — Association — Mathematical concepts
30.99 CD approved for registration as DIS
Preparation of metallographic specimens used for porosity determination
10.99 New project approved
Ultrasonic testing of hardmetals
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Mobile machinery — High speed interconnect (HSI) — Part 1: Part 1: General information and vocabulary
20.00 New project registered in TC/SC work programme
Mobile machinery — High speed interconnect (HSI) — Part 10: Communication channel
40.20 DIS ballot initiated: 12 weeks
Mobile machinery — High speed interconnect (HSI) — Part 2: Part 2: System and network architecture
20.00 New project registered in TC/SC work programme
Mobile machinery — High speed interconnect (HSI) — Part 3: Single communication channel coupling connector
40.20 DIS ballot initiated: 12 weeks