Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Integrated circuits - EMC evaluation of transceivers - Part 3: CAN transceivers
30.60 Close of voting/ comment period
Integrated circuits - EMC evaluation of transceivers - Part 5: Ethernet transceivers
30.20 CD study/ballot initiated
Integrated circuits - EMC evaluation of transceivers - Part 7: CXPI transceivers
50.99 FDIS or proof approved for publication
Determination of RF field strength, power density and SAR in the vicinity of base stations for the purpose of evaluating human exposure
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF radiotelephone equipment incorporating Class "D" Digital Selective Calling (DSC) - Methods of testing and required test results
30.99 CD approved for registration as DIS
Process management for avionics - Electronic components capability in operation - Part 2: Semiconductor microcircuit lifetime
30.60 Close of voting/ comment period
Nuclear power plants - Human-machine interfaces - Alarm functions and presentation
40.00 DIS registered
Radiation protection instrumentation - Installed radiation portal monitors (RPMs) for the detection of illicit trafficking of radioactive and nuclear materials
20.99 WD approved for registration as CD
Photovoltaic pumping systems - Design qualification and performance measurements
20.99 WD approved for registration as CD
Photovoltaic pumping systems - Part 1: Performance, safety, and durability assessment for small-scale off-grid solar water pumps
20.99 WD approved for registration as CD
Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
30.99 CD approved for registration as DIS
Renewable energy off-grid systems - Part 10: Silicon solar module visual inspection guide
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 120: Procurement processes, including tendering and evaluation
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 200: System selection and design
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Photovoltaic (PV) stand alone systems - Design verification
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 320: Generator set - Off-grid wind turbines
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 330: Generator set - Selection of generator sets for rural electrification systems
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries
50.00 Final text received or FDIS registered for formal approval