DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Amendment 1 - Cooking fume extractors - Methods for measuring performance

30.20 CD study/ballot initiated

TC 59/SC 59K more

Insulating liquids - Contamination by polychlorinated biphenyls (PCBs) - Method of determination by capillary column gas chromatography

20.99 WD approved for registration as CD

TC 10 more

Dry, solid insulating materials - Resistance test to high-voltage, low-current arc discharges

20.99 WD approved for registration as CD

TC 112 more

Low-voltage switchgear and controlgear assemblies - Internal arc-fault protection of low-voltage switchgear and controlgear assemblies in accordance with the IEC 61439 series

40.99 Full report circulated: DIS approved for registration as FDIS

TC 121/SC 121B more

Low-voltage surge protective devices - Requirements and test methods of SPD monitoring device (SMD)

30.60 Close of voting/ comment period

TC 37/SC 37A more

Low-voltage surge protective devices - Part 06: Requirements and test methods for SPD specific disconnectors

40.99 Full report circulated: DIS approved for registration as FDIS

TC 37/SC 37A more

Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Requirements and test methods

50.60 Close of voting. Proof returned by secretariat

TC 37/SC 37A more

Components for low-voltage surge protection - Part 333: characteristic equations and life evaluation for metal oxide varistors (MOV)

40.99 Full report circulated: DIS approved for registration as FDIS

TC 37/SC 37B more

Low-voltage surge protective components - Part 361: Surge isolation transformers (SITs) connected to low-voltage distribution system – Requirements and test methods

40.20 DIS ballot initiated: 12 weeks

TC 37/SC 37B more

Radionuclide imaging devices - Characteristics and test conditions - Part 2: Gamma cameras for planar, wholebody, and SPECT imaging

40.60 Close of voting

TC 62/SC 62C more

Photovoltaic systems - Power conditioners - Procedure for measuring efficiency

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic system performance - Part 1: Monitoring

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic system performance - Part 2: Power performance index and capacity evaluation method

50.60 Close of voting. Proof returned by secretariat

TC 82 more

Photovoltaic system performance - Part 3: Energy evaluation method

20.99 WD approved for registration as CD

TC 82 more

Amendment 1 - Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction

20.99 WD approved for registration as CD

TC 82 more

Amendment 1 - Photovoltaic (PV) module safety qualification - Part 2: Requirements for testing

20.99 WD approved for registration as CD

TC 82 more

Fibre optic interconnecting devices and passive components - Performance standard - Part 021-03: Single-mode fibre optic connectors terminated as pigtails and patchcords for category OP – Outdoor protected environment

50.99 FDIS or proof approved for publication

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components - Performance standard - Part 021-07: Hardened fibre optic connectors terminated on singlemode fibre for category A - Outdoor aerial environment

30.60 Close of voting/ comment period

TC 86/SC 86B more