DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Communication networks and systems for power utility automation - Part 80-6: Using IEC 61850 for communication between substations and control centres

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 more

Communication networks and systems for power utility automation - Part 80-7: Communication services and data model to support IEC 61850 system management

20.99 WD approved for registration as CD

TC 57 more

Communication networks and systems for power utility automation - Part 90-19: Power system IED communication and associated data models for interoperability - Role Based Access Control (RBAC) with IEC 61850

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 more

Communication networks and systems for power utility automation - Part 90-19: Using Role Based Access Control (RBAC) and IEC 61850

00.00 Proposal for new project received

TC 57 more

Communication networks and systems for power utility automation - Part 90-21: Travelling wave fault location

60.00 Standard under publication

TC 57 more

Communication networks and systems for power utility automation - Part 90-22: SCD based substation network auto-routing with visualization and supervision support

60.00 Standard under publication

TC 57 more

Communication networks and systems for power utility automation - Part 90-23: Use of IEC 61850 for microgrid systems

20.99 WD approved for registration as CD

TC 57 more

Communication networks and systems for power utility automation - Part 90-30: IEC 61850 Function Modelling in SCL

60.00 Standard under publication

TC 57 more

Communication networks and systems for power utility automation - Part 90-31: Use Cases for Dynamic Data model

20.99 WD approved for registration as CD

TC 57 more

Communication networks and systems for power utility automation - Part 90-20: Guideline to redundancy systems

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 more

Electric vehicle conductive charging system - Part 1: General requirements

30.60 Close of voting/ comment period

TC 69 more

Electric vehicle conductive charging system - Part 21-1 Electric vehicle on-board charger EMC requirements for conductive connection to AC/DC supply

30.60 Close of voting/ comment period

TC 69 more

Electric vehicle conductive charging system - Part 21-2: Electric vehicle requirements for conductive connection to an AC/DC supply - EMC requirements for off board electric vehicle charging systems

30.99 CD approved for registration as DIS

TC 69 more

Electric vehicle conductive charging system - Part 23: DC electric vehicle supply equipment

20.99 WD approved for registration as CD

TC 69 more

<p>Electric vehicle conductive charging system - Part 23-1: DC Charging with an automatic connection system</p>

30.99 CD approved for registration as DIS

TC 69 more

<p>Electric vehicle conductive charging system - Part 23-3: DC electric vehicle supply equipment for Megawatt charging systems</p>

30.99 CD approved for registration as DIS

TC 69 more

Electric vehicle conductive charging system - Part 23-4: Portable DC EV supply equipment

20.99 WD approved for registration as CD

TC 69 more

Electric vehicle conductive charging system - Part 24: Digital communication between a DC EV supply equipment and an electric vehicle for control of DC charging

20.99 WD approved for registration as CD

TC 69 more