DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Part 22: Instrument transformers integrated with other devices with <em>U</em><sub>m</sub> ≤ 36 kV - Requirements and tests

40.00 DIS registered

TC 38 more

Instrument transformers - Part 3: Additional requirements for inductive voltage transformers

20.99 WD approved for registration as CD

TC 38 more

Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers

20.99 WD approved for registration as CD

TC 38 more

Amendment 1 - Instrument transformers - Part 9: Digital interface for instrument transformers

30.99 CD approved for registration as DIS

TC 38 more

Nuclear instrumentation - Geophysical borehole instrumentation to determine rock density ('density logging')

40.20 DIS ballot initiated: 12 weeks

TC 45 more

Subsea equipment - Part 2: Power transformers

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 18 more

Nuclear power plants - Instrumentation important to safety - Determination and maintenance of trip setpoints

30.60 Close of voting/ comment period

TC 45/SC 45A more

Mobile and fixed offshore units - Electrical installations - Part 1: General requirements and conditions

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 2: System design

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 3: Equipment

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 4: Cables

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 5: Mobile units

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 6: Installation

40.20 DIS ballot initiated: 12 weeks

TC 18 more

Mobile and fixed offshore units - Electrical installations - Part 7: Hazardous areas

30.20 CD study/ballot initiated

TC 18 more

Tests recommended on cables with a longitudinally applied metal foil for rated voltages above 30 kV (U<sub>m</sub> = 36 kV) up to and including 500 kV (U<sub>m</sub> = 550 kV)

20.99 WD approved for registration as CD

TC 20 more

Amendment 1 - Specification for the testing of balanced and coaxial information technology cabling - Part 2: Cords as specified in ISO/IEC 11801-1 and related standards

40.60 Close of voting

TC 46 more

Specification for the testing of balanced and coaxial information technology cabling - Part 4: Installed balanced single-pair cabling as specified in ISO/IEC 11801-1 and related standards

30.99 CD approved for registration as DIS

TC 46 more

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 0: Principles to be observed in the design and erection of high voltage installations - Safety of high voltage installations

30.60 Close of voting/ comment period

TC 99 more