DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components – Performance standard – Part 451-07: Terminal for category A – Outdoor aerial environment

10.60 Close of voting

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components – Performance standard – Part 451-08: Sealed terminals for category G – Outdoor ground environment

10.60 Close of voting

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components - Performance standard for automotive applications – Part 1: General and guidance

10.60 Close of voting

TC 86/SC 86B more

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 more

Underwater acoustics ̶ Calibration of interferometric fiber-optic hydrophones in the frequency range 10 Hz to 20 kHz

10.20 New project ballot initiated

TC 87 more

Wind Energy Generation Systems – Part 18: Design Guideline for Pitch Bearings

00.00 Proposal for new project received

TC 88 more

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 more

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00 Proposal for new project received

TC 88 more

Technical Specification for Harmonic Evaluation of Offshore Wind Farms Grid-connected via VSC-HVDC

10.20 New project ballot initiated

TC 8/SC 8A more

Roadmap of grid integration of renewable energy generation

00.00 Proposal for new project received

TC 8/SC 8A more

Grid-forming technology and applications in renewable energy dominated power systems

00.00 Proposal for new project received

TC 8/SC 8A more

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C more

Business Use Cases (BUCs) of Flexibility Services

10.20 New project ballot initiated

TC 8/SC 8C more

Primary Frequency Coordinated Control Framework of System with High Penetration of Inverter Based Generation

00.00 Proposal for new project received

TC 8/SC 8C more

Standardization of Heat-Loss Measurement of ancillary systems to maintain the superconducting state, such as thermal insulation pipe and/or cryostat for superconducting cables and current leads

00.00 Proposal for new project received

TC 90 more

Materials for printed boards and other interconnecting structures - Part 2-XX: Reinforced base materials clad and unclad – Non-halogenated epoxide modified bismaleimide/triazine with filler woven glass laminate sheets of low thermal expansion and flammability (vertical burning test), copper-clad for IC substrate

10.20 New project ballot initiated

TC 91 more