Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post-accident conditions - Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
30.60 Close of voting/ comment period
Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post-accident conditions - Part 4: Equipment for continuous in-line or on-line monitoring of radioactivity in process streams
30.60 Close of voting/ comment period
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
30.60 Close of voting/ comment period
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
30.99 CD approved for registration as DIS
Functional design criteria for a safety parameter display system for nuclear power stations
30.60 Close of voting/ comment period
Radio frequency and coaxial cable assemblies - Part 2-8: Detail specification for cable assemblies for radio and TV receivers - Frequency range up to 3000 MHz, Screening class A++, IEC 61169-47 connectors
50.99 FDIS or proof approved for publication
Radio frequency and coaxial cable assemblies - Part 4-4: Detail specification for multi channel semi-rigid cable assemblies, frequency up to 6000MHz, with type 50-5 semi-rigid coaxial cable
40.20 DIS ballot initiated: 12 weeks
Arc welding equipment - Part 1: Welding power sources
40.20 DIS ballot initiated: 12 weeks
Amendment 1 - Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Arc welding equipment - Part 7: Torches
20.99 WD approved for registration as CD
Nuclear power plants - Instrumentation important to safety - Acoustic monitoring systems for detection of loose parts: characteristics, design criteria and operational procedures
20.99 WD approved for registration as CD
Evaluation methods for protection against risk of fire in electric tumble dryers
00.99 Approval to ballot proposal for new project
Electromagnetic compatibility (EMC) - Part 1-6: General – Guidelines to the evaluation of measurement uncertainty in EMC testing
40.99 Full report circulated: DIS approved for registration as FDIS
Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 A per phase and not subject to conditional connection
30.60 Close of voting/ comment period
Electromagnetic compatibility (EMC) – Part 3-10: Limits – Limits for disturbance voltage and current in the frequency range from 2kHz to 9kHz produced by equipment connected to public low-voltage systems with a rated line current less than or equal to 75 A per phase
30.60 Close of voting/ comment period
Electromagnetic compatibility (EMC) - Part 3-17: Limits – Limitation of voltage fluctuations and flicker in public low-voltage systems – Energy-producing equipment with rated current less than or equal to 75 A per phase
20.99 WD approved for registration as CD
Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
40.60 Close of voting
Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods
50.00 Final text received or FDIS registered for formal approval