Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Assessment of Human Exposure to Electromagnetic Fields from Radiative Wireless Power Transfer Systems: Measurement and Computational Methods (Frequency Range of 30 MHz to 300 GHz)
20.99 WD approved for registration as CD
Accessibility Goals and Needs with an exemplar of use with a household voice control system
30.60 Close of voting/ comment period
Methods for spectral imaging performance evaluation of computed tomography
40.60 Close of voting
Intelligent information request and delivery - A process model for the exchange of information for use
20.99 WD approved for registration as CD
Joint commissioning for grid-connection of offshore wind farms using VSC HVDC transmission
50.60 Close of voting. Proof returned by secretariat
Railway applications - Technical criteria for the coordinations in neutral-section passing system for train
40.99 Full report circulated: DIS approved for registration as FDIS
Terms and Definition for standards incorporating power electronic conversion
30.20 CD study/ballot initiated
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
30.60 Close of voting/ comment period
Transformer bushings dimensional standardization - Part 2: High voltage bushings
30.60 Close of voting/ comment period
Lighting systems - Electro-mechanical interfaces - Part 1: Safety
50.60 Close of voting. Proof returned by secretariat
Lighting systems - Electro-mechanical interfaces - Part 2-1: Four-pin extra-low-voltage twist-lock interface Type ZB18
50.60 Close of voting. Proof returned by secretariat
Railway application - Interoperability and safety requirements for dynamic wireless power transfer systems - Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Floating photovoltaic power plants - Design guidelines and recommendations
20.99 WD approved for registration as CD
Shunt-connected active correction devices (ACD)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - System energy efficiency
50.00 Final text received or FDIS registered for formal approval
IEC TR 63500-1: Unified power flow controller (UPFC) installations - Part 1: Performance
20.99 WD approved for registration as CD
Calibration of the prompt fission neutron logging tools
40.99 Full report circulated: DIS approved for registration as FDIS
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
40.00 DIS registered