Low-voltage switchgear and controlgear - Part 10: Semiconductor Circuit-Breakers
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage switchgear and controlgear - Part 5-3: Control circuit devices and switching elements - Requirements for proximity devices with defined behaviour under fault conditions (PDDB)
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage switchgear and controlgear - Part 5-5: Control circuit devices and switching elements - Electrical emergency stop device with mechanical latching function
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment
40.99 Full report circulated: DIS approved for registration as FDIS
Low-voltage switchgear and controlgear - Part 7-2: Ancillary equipment - Protective conductor terminal blocks for copper conductors
30.20 CD study/ballot initiated
Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper conductors
30.20 CD study/ballot initiated
Calculation of thermally permissible short-circuit currents, taking into account non-adiabatic heating effects
20.99 WD approved for registration as CD
Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post-accident conditions - Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
30.60 Close of voting/ comment period
Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post-accident conditions - Part 4: Equipment for continuous in-line or on-line monitoring of radioactivity in process streams
30.60 Close of voting/ comment period
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
30.60 Close of voting/ comment period
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
30.60 Close of voting/ comment period
Functional design criteria for a safety parameter display system for nuclear power stations
30.60 Close of voting/ comment period
Radio frequency and coaxial cable assemblies - Part 2-8: Detail specification for cable assemblies for radio and TV receivers - Frequency range up to 3000 MHz, Screening class A++, IEC 61169-47 connectors
50.99 FDIS or proof approved for publication
Radio frequency and coaxial cable assemblies - Part 4-4: Detail specification for multi channel semi-rigid cable assemblies, frequency up to 6000MHz, with type 50-5 semi-rigid coaxial cable
40.20 DIS ballot initiated: 12 weeks
Amendment 1 - Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Arc welding equipment - Part 7: Torches
20.99 WD approved for registration as CD
Nuclear power plants - Instrumentation important to safety - Acoustic monitoring systems for detection of loose parts: characteristics, design criteria and operational procedures