Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Internet of Things (IoT) - Interoperability for IoT systems - Part 2: Transport interoperability
20.99 WD approved for registration as CD
Internet of things – Interoperability for IoT systems – Part 5: Behavioural and policy interoperability
30.60 Close of voting/ comment period
Artificial Intelligence – Functional Safety and AI – Part 1: Requirements
20.99 WD approved for registration as CD
Artificial Intelligence – Functional Safety and AI – Part 2: Guidance
20.99 WD approved for registration as CD
Artificial Intelligence – Functional Safety and AI – Part 3: Examples of application
20.99 WD approved for registration as CD
PWI TR 22F-18 Performance of power electronics transformer for flexible transmission and distribution system
00.00 Proposal for new project received
Performance of high-voltage direct current (HVDC) systems with line-commutated converters - Part 3: Dynamic conditions
20.99 WD approved for registration as CD
Unified power flow controller (UPFC) installations - System design
00.00 Proposal for new project received
Testing methods for equivalent converter impedance at AC side of VSC-HVDC systems
00.00 Proposal for new project received
Method of real-time simulation modelling for high voltage direct current (HVDC) equipment
00.00 Proposal for new project received
Dynamic braking system (DBS) for HVDC transmission systems
00.00 Proposal for new project received
Nanotechnologies - Structural characterization of graphene oxide flakes: thickness and lateral size measurement using AFM and SEM
20.99 WD approved for registration as CD
Power loss and control circuit power consumption for circuit-breakers and similar equipment for household use
10.20 New project ballot initiated
Residual current operated circuit-breakers for household and similar uses for dc systems - Part 1: Residual current operated circuit breakers with integral overcurrent protection (DC-RCBOs)
00.00 Proposal for new project received
Switches for appliances - Part 1: General requirements
00.99 Approval to ballot proposal for new project
Information technology - Generic cabling – Physical network security for the accommodation of customer premises cabling infrastructure and information technology equipment
40.20 DIS ballot initiated: 12 weeks
Fuse-links for road vehicles - Fuse-links with a rated voltage up to 1000V AC and 1500V DC
20.99 WD approved for registration as CD