DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 62439-6:2010

Rrjeta industriale komunikimi - Rrjeta automatizimi me disponueshmëri të lartë - Pjesa 6: Protokoll i tepricës i shpërndarë (DRP)

Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
13 dhj 2011

General information

60.60     13 dhj 2011

DPS

DPS/KT 9

European Norm

25.040     35.040  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 62439-6:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a recovery protocol based on a ring topology, designed to react deterministically on a single failure of an inter-switch link or switch in the network. Each switch has equal management role in the network. Double rings are supported. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008): - adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), - adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol), - moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents, - moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes, - moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes, - moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and - moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes, - adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8, - adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and - introducing the DRP protocol as IEC 62439-6.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 62439:2008

NOW

PUBLISHED
SSH EN 62439-6:2010
60.60 Standard published
13 dhj 2011

Related project

Adopted from EN 62439-6:2010

Adopted from IEC 62439-6 Ed. 1.0 en