Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Power quality management - Part 1: General guidelines
50.00 Final text received or FDIS registered for formal approval
Power quality management - Part 4: Harmonic analysis on public electric power network
50.60 Close of voting. Proof returned by secretariat
Management of network assets in power systems - Part 1: Overview, principles and terminology
40.20 DIS ballot initiated: 12 weeks
Management of network assets in power systems - Risk-informed decision-making process
40.20 DIS ballot initiated: 12 weeks
Amendment 1 - Managing fire risk related to photovoltaic (PV) systems on buildings
30.20 CD study/ballot initiated
Fatigue assessment of hydraulic turbine runners: from design to quality assurance
40.99 Full report circulated: DIS approved for registration as FDIS
Live working - Hand protective devices against the thermal hazards of an electric arc - Part 2: Requirements
20.99 WD approved for registration as CD
Radio frequency beam wireless power transfer (WPT) for mobile devices
50.00 Final text received or FDIS registered for formal approval
Electric motor-operated tools - Dust measurement procedure - Part 3-3: Particular requirements for transportable planers and thicknessers
60.00 Standard under publication
CDD Database - Cable tray systems and cable ladder systems
20.99 WD approved for registration as CD
Power line communication for DC shutdown equipment - Communication signal, physical layer
50.60 Close of voting. Proof returned by secretariat
Winding wires - Test methods - Electrical endurance under high frequency voltage impulses
60.00 Standard under publication
Composite insulators with integrated optical fibres for AC voltages greater than 1000 V and DC voltages greater than 1500 V - Definitions, test methods and acceptance criteria
50.00 Final text received or FDIS registered for formal approval
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced macrobend multimode fibres – Part 3-1: Connector parameters of physically contacting 50 µm core diameter fibres – Non-angled 2,5 mm and 1,25 mm diameter cylindrical full zirconia ferrules
30.60 Close of voting/ comment period
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
20.99 WD approved for registration as CD
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
30.60 Close of voting/ comment period
Asset administration shell for industrial applications - Part 4:Applications of Asset Administration Shell
40.20 DIS ballot initiated: 12 weeks