Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Road vehicles - Vehicle to grid communication interface — Part 23: Second generation network layer and application layer requirements conformance test plan for DC charging
50.99 FDIS or proof approved for publication
Road vehicles - Vehicle to grid communication interface - Part 4: Network and application protocol conformance test
40.60 Close of voting
Amendment 1 - Road vehicles - Vehicles to grid communication interface - Part 5: Physical and data link layer conformance tests<br /> (informative Annex regarding test case relevance for interoperability of SUT EV/EVSE for MAC/PHY layer tests to align with ISO 15118-4 (ed2))
30.99 CD approved for registration as DIS
Amendment 1 - Fragment 1: 18 GHz - 40 GHz Instrumentation
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 1 - Fragment 2: Discontinuous Analyzers
40.99 Full report circulated: DIS approved for registration as FDIS
Amendment 2 - Fragment 1: 18-40 GHz Antenna calibration sites and reference sites
20.99 WD approved for registration as CD
Amendment 2 - Fragment 2: Calculable loop antennas
30.99 CD approved for registration as DIS
Amendment 3 - Fragment 1: 18-40 GHz EMC antenna calibration
20.99 WD approved for registration as CD
Amendment 3 - Fragment 2: Two homogenous antennas
30.20 CD study/ballot initiated
Amendment 3 - Fragment 3: Calculable loop antennas
30.99 CD approved for registration as DIS
Amendment 3 - Fragment 5: C-SAM
30.99 CD approved for registration as DIS
Fragment 1: General Maintenance and CISPR history
40.99 Full report circulated: DIS approved for registration as FDIS
Fragment 2: Relationship of limits for SAC and FAR
30.60 Close of voting/ comment period
Fragment 3: Rationale for measurements and procedures for wired network port emissions
40.99 Full report circulated: DIS approved for registration as FDIS
Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty
30.20 CD study/ballot initiated
Radio interference characteristics of overhead power lines and high-voltage equipment - Part 1: Description of phenomena
40.99 Full report circulated: DIS approved for registration as FDIS
Utility connections in port – Part 4: DC shore connection (DCSC) systems – General requirements
10.60 Close of voting