Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Floating photovoltaic power plants - Design guidelines and recommendations
20.99 WD approved for registration as CD
Shunt-connected active correction devices (ACD)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway applications - System energy efficiency
50.00 Final text received or FDIS registered for formal approval
IEC TR 63500-1: Unified power flow controller (UPFC) installations - Part 1: Performance
20.99 WD approved for registration as CD
Calibration of the prompt fission neutron logging tools
40.99 Full report circulated: DIS approved for registration as FDIS
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
40.20 DIS ballot initiated: 12 weeks
<p>CDD Database - Circuit-breakers and similar equipment for household use</p>
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
30.99 CD approved for registration as DIS
Fixed folding durability test method for flexible opto-electric circuit boards
40.99 Full report circulated: DIS approved for registration as FDIS
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
50.00 Final text received or FDIS registered for formal approval
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
40.99 Full report circulated: DIS approved for registration as FDIS
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and Measurements - Part 0: General and Guidance
40.99 Full report circulated: DIS approved for registration as FDIS
Electrical relays - Tests and measurements - Part 19: Electrical endurance
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks