Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
40.00 DIS registered
Thermal standardization on semiconductor packages - Part 6: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points
60.00 Standard under publication
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
40.60 Close of voting
Vehicle connector, vehicle inlet and cable assembly for Megawatt DC charging
60.00 Standard under publication
<p>Standard Interface for Connecting Charging stations to Local Energy Management Systems - Part-4 Test Specifications</p>
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 2: Data models Protocols, Messages
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 3: Conformance tests
20.99 WD approved for registration as CD
Power System Stability Control - Part 2: Guideline for quantitative assessment of power system stability and security
60.00 Standard under publication
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
40.20 DIS ballot initiated: 12 weeks
Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets
20.99 WD approved for registration as CD
Sustainable management of waste electrical and electronic equipment (e-waste) (Proposed Horizontal Publication)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Black start of hydropower plant
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource manager(s) (Proposed horizontal publication)
50.00 Final text received or FDIS registered for formal approval
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
30.99 CD approved for registration as DIS
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
30.99 CD approved for registration as DIS