Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Fatigue assessment of hydraulic turbine runners: from design to quality assurance
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Live working - Hand protective devices against the thermal hazards of an electric arc - Part 2: Requirements
20.99 WD approved for registration as CD
Radio frequency beam wireless power transfer (WPT) for mobile devices
50.00 Final text received or FDIS registered for formal approval
CDD Database - Cable tray systems and cable ladder systems
30.20 CD study/ballot initiated
Power line communication for DC shutdown equipment - Communication signal, physical layer
50.60 Close of voting. Proof returned by secretariat
Composite insulators with integrated optical fibres for AC voltages greater than 1000 V and DC voltages greater than 1500 V - Definitions, test methods and acceptance criteria
50.60 Close of voting. Proof returned by secretariat
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced macrobend multimode fibres – Part 3-1: Connector parameters of physically contacting 50 µm core diameter fibres – Non-angled 2,5 mm and 1,25 mm diameter cylindrical full zirconia ferrules
40.20 DIS ballot initiated: 12 weeks
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-XX: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications
30.20 CD study/ballot initiated
Amendment 1 - Fibre optic interconnecting devices and passive components - Connector optical interfaces for enhanced macro bend multimode fibre - Part 3-81: Connector parameters of physically contacting 50 μm core diameter fibres - Non-angled polyphenylene sulphide rectangular ferrules with a single row of 12, 8, 4, or 2 fibres for reference connector applications
30.20 CD study/ballot initiated
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
30.60 Close of voting/ comment period
Asset administration shell for industrial applications - Part 4:Applications of Asset Administration Shell
40.60 Close of voting
Asset Administration Shell for industrial applications – Part 5: Interfaces
30.60 Close of voting/ comment period
E-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters
40.99 Full report circulated: DIS approved for registration as FDIS
E-Transporters - Part 4-1: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Emission
20.99 WD approved for registration as CD
E-Transporters – Part 4-2: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Immunity
20.99 WD approved for registration as CD
Interface requirements of autonomous cargo e-Transporters and cloud platform scheduling system
20.99 WD approved for registration as CD