Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Information Technology-Telecommunications and information exchange between systems - Wearable suit area network (WSAN)
30.20 CD study/ballot initiated
<p>Electrical energy storage(ESS) systems Part 5-4 – Safety test methods and procedures for grid integrated EES systems – Electrochemical-based systems</p>
00.99 Approval to ballot proposal for new project
Electric Energy Storage Systems; Part 3-2: Planning and performance assessment of electrical energy storage systems - Additional requirements for power intensive and renewable energy sources integration related applications
00.99 Approval to ballot proposal for new project
Electrical Energy Storage (EES) systems - Part 3-2: Planning and performance assessment of electrical energy storage systems - Specific requirements for power intensive and renewable energy sources integration related applications
00.99 Approval to ballot proposal for new project
Electrical Energy Storage (EES) systems - Part 3-3: Planning and performance assessment of electrical energy storage systems - Specific requirements for energy intensive and backup power applications
00.99 Approval to ballot proposal for new project
Future IEC 63203-402-X: Wearable electronic devices and technologies - Part 402-X: Performance Measurement of Fitness Wearables - Test methods of glove-type motion sensing products
00.00 Proposal for new project received
Future IEC 63203-2XX-X: Wearable electronic devices and technologies - Part 2XX-X: Test method to characterize impedance of stretchable e-textiles under deformation
00.00 Proposal for new project received
Development of product specific rules to assess the carbon footprint of products
20.99 WD approved for registration as CD
Low-voltage auxiliary power systems ‒Part 2-4: Design criteria- Low-voltage AC auxiliary power systems for hydropower stations
00.99 Approval to ballot proposal for new project
Guide on the Development of a new standard as database (SDB)
20.99 WD approved for registration as CD
Wheeled, tracked or legged robots - Part 2-11: Unmanned Aircraft Dock System for Substation Inspection - General requirement, test methods and acceptance criteria
10.20 New project ballot initiated
Wheeled, tracked or legged robots - Part 3-11: Outdoor Wheeled Inspection Robot System for Substation - General requirement, test methods and<br /> acceptance criteria.
10.20 New project ballot initiated