Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Safety of machinery - Requirements for cableless control systems of machinery
40.00 DIS registered
Systems interface between customer energy management system and the power management system - Part 10-1: Open Automated Demand Response (OpenADR 2.0b Profile Specification)
60.00 Standard under publication
Systems interface between customer energy management system and the power management system - Part 2: Use cases and requirements
60.00 Standard under publication
Terminology for voltage-sourced converters (VSC) for high-voltage direct current (HVDC) systems
20.99 WD approved for registration as CD
Amendment 2 - Terminology for voltage-sourced converters (VSC) for high-voltage direct current (HVDC) systems
60.00 Standard under publication
Assessment of power quality - Characteristics of electricity supplied by public networks
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Calibration of space charge measuring equipment based on the pulsed electro-acoustic (PEA) measurement principle – Part 2: High temperature measurement
20.99 WD approved for registration as CD
Twinax cables for digital communication - Part 3: Family specification - Cable for SAS physical interfaces
30.60 Close of voting/ comment period
Distributed energy resources connection with the grid - Part 10: Tests
20.99 WD approved for registration as CD
Distributed energy resources connection with the grid - Generating plants and units grid connection standard mapping
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Distributed energy resources connection with the grid - Part 101 Gravity storage connection to the grid
40.99 Full report circulated: DIS approved for registration as FDIS
IEC TR 62786-103 Distributed energy resources connection with the grid – Part 103 V2G application scenarios for the grid
30.20 CD study/ballot initiated
Distributed energy resources connection with the grid - Part 2: Additional requirements for PV generation systems
50.60 Close of voting. Proof returned by secretariat
Distributed energy resources connection with the grid - Part 42: Technical requirements for voltage measurement used to control DER and loads
60.00 Standard under publication
Amendment 2 - Measurement procedures for materials used in photovoltaic modules - Part 1-4: Encapsulants - Measurement of optical transmittance and calculation of the solar-weighted photon transmittance, yellowness index, and UV cut-off wavelength
20.99 WD approved for registration as CD
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 2-1: Polymeric materials - Frontsheet and backsheet - Safety requirements
30.99 CD approved for registration as DIS
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials
20.99 WD approved for registration as CD
Measurement method for the output of electroshock weapons
50.00 Final text received or FDIS registered for formal approval