Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Industrial process control devices - Radiation thermometers - Part 2: Determination of the technical data for radiation thermometers
30.99 CD approved for registration as DIS
Optical circuit boards – Part 2-6: Basic test and measurement procedures – Near field pattern analysis of multimode optical waveguides with rectangular core(s) using encircled flux methodology
40.00 DIS registered
<p>Optical circuit boards – Part 4-3: Interface standards – Terminated waveguide OCB assembly using a single-row 32-channel PMT connector intermateable with a 250-μm pitch MPO 16</p>
60.00 Standard under publication
Radiation protection instrumentation - Cargo/vehicle radiographic inspection system
30.60 Close of voting/ comment period
Radiation protection instrumentation - Highly sensitive hand-held instruments for photon detection of radioactive material
40.20 DIS ballot initiated: 12 weeks
Guide for the statistical analysis of electrical insulation breakdown data
20.99 WD approved for registration as CD
OPC Unified Architecture – Part 1: Overview and concepts
60.00 Standard under publication
OPC Unified Architecture - Part 11: Historical Access
60.00 Standard under publication
OPC Unified Architecture - Part 12: Discovery and global services
60.00 Standard under publication
OPC unified architecture – Part 2: Security model
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
OPC Unified Architecture – Part 21: Device Onboarding
60.00 Standard under publication
OPC Unified Architecture – Part 22: Base Network Model
60.00 Standard under publication
OPC Unified Architecture – Part 23: Common ReferenceTypes
60.00 Standard under publication
OPC Unified Architecture - Part 3: Address Space Model
60.00 Standard under publication
OPC Unified Architecture - Part 5: Information Model
60.00 Standard under publication