DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Optical fibre cables - Part 8: Optical fibre cables for use in automotive applications - Sectional specification

10.60 Close of voting

TC 86/SC 86A more

Optical fibre cables – Part 1-32: Generic specification – Optical cable elements – Buffered optical fibre

10.60 Close of voting

TC 86/SC 86A more

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – PERFORMANCE STANDARD – Part 085-03: Non-connectorized single-mode pigtailed CWDM devices for category OP – Outdoor protected environment

10.20 New project ballot initiated

TC 86/SC 86B more

FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – PERFORMANCE STANDARD – Part 085-06: Non-connectorized single-mode pigtailed CWDM devices for category OP+ – Extended outdoor protected environment

10.20 New project ballot initiated

TC 86/SC 86B more

IEC 63412-2: Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

00.00 Proposal for new project received

TC 87 more

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 more

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 more

Wind Energy Generation Systems – Part 60-1: Validation of computations models for loads and power performance

10.60 Close of voting

TC 88 more

PV integrated LVDC power system — collected leakage current limits and test procedures

10.60 Close of voting

TC 8/SC 8A more

Roadmap of grid integration of renewable energy generation

00.00 Proposal for new project received

TC 8/SC 8A more

General requirements for grid-forming control of renewable energy

00.00 Proposal for new project received

TC 8/SC 8A more

Guideline for the black start of offshore wind farms grid-connected via VSC-HVDC

00.00 Proposal for new project received

TC 8/SC 8A more

Decentralized multiple energy systems

00.00 Proposal for new project received

TC 8/SC 8B more

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C more

Electric power system restoration - Part 1: general guidelines

10.20 New project ballot initiated

TC 8/SC 8C more

Guidelines for inertia management of renewable penetrated power system – Part 1: Framework design

10.20 New project ballot initiated

TC 8/SC 8C more