DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Amendment 1 - Composite hollow core station post insulators with AC voltage greater than 1 000 V and DC voltage greater than 1 500 V - Definitions, test methods and acceptance criteria

30.99 CD approved for registration as DIS

TC 36 more

Application guidelines - Technical and financial processes for implementing asset management systems

20.99 WD approved for registration as CD

TC 56 more

Twinax cables for digital communication - Part 3: Family specification - Cable for SAS physical interfaces

40.20 DIS ballot initiated: 12 weeks

TC 46/SC 46C more

Distributed energy resources connection with the grid - Part 10: Tests

20.99 WD approved for registration as CD

TC 8 more

Distributed energy resources connection with the grid - Part 101: Gravity storage connection to the grid

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 8 more

IEC TR 62786-103 Distributed energy resources connection with the grid – Part 103 V2G application scenarios for the grid

40.99 Full report circulated: DIS approved for registration as FDIS

TC 8 more

IEC TR 62786-104 Distributed energy resources connection with the grid - Part 104 Typical application scenarios of distributed PV systems

50.00 Final text received or FDIS registered for formal approval

TC 8 more

Measurement procedures for materials used in photovoltaic modules - Part 1-8: Encapsulants - Test method of acid value

20.99 WD approved for registration as CD

TC 82 more

Amendment 2 - Measurement procedures for materials used in photovoltaic modules - Part 1-4: Encapsulants - Measurement of optical transmittance and calculation of the solar-weighted photon transmittance, yellowness index, and UV cut-off wavelength

40.00 DIS registered

TC 82 more

Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 2-1: Polymeric materials - Frontsheet and backsheet - Safety requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 82 more

Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials

30.20 CD study/ballot initiated

TC 82 more

Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 8-1: Electrically conductive adhesive (ECA) - Measurement of material properties

20.99 WD approved for registration as CD

TC 82 more

Measurement Procedures for Materials Used in Photovoltaic Modules - Part 9-2: Glass - measurement of physical and mechanical characteristics

20.99 WD approved for registration as CD

TC 82 more

Thunderstorm warning systems - Protection against lightning

20.99 WD approved for registration as CD

TC 81 more

Hybrid telecommunication cables - Part 1: Generic specification

20.99 WD approved for registration as CD

TC 46/SC 46C more

Hybrid communication cables - Part 2: Indoor hybrid cables - Sectional specification

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 46/SC 46C more

Amendment 2 - Photovoltaic systems - Design qualification of solar trackers

50.00 Final text received or FDIS registered for formal approval

TC 82 more

Photovoltaic systems – Part 1: Design qualification of horizontal single axis solar trackers

20.99 WD approved for registration as CD

TC 82 more