Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Amendment 1 - Fibre optic interconnecting devices and passive components - Connector optical interfaces for enhanced macro bend multimode fibre - Part 3-81: Connector parameters of physically contacting 50 μm core diameter fibres - Non-angled polyphenylene sulphide rectangular ferrules with a single row of 12, 8, 4, or 2 fibres for reference connector applications
20.99 WD approved for registration as CD
Industrial automation equipment and systems – Part 2: Algorithm Verification Methods
30.20 CD study/ballot initiated
Asset Administration Shell for Industrial Applications – Part 2: Information meta model
30.60 Close of voting/ comment period
Asset Administration Shell for Industrial Applications – Part 3: Security provisions for Asset Administration Shells
30.60 Close of voting/ comment period
Asset administration shell for industrial applications - Part 4:Applications of Asset Administration Shell
40.60 Close of voting
Asset Administration Shell for industrial applications – Part 5: Interfaces
30.60 Close of voting/ comment period
E-Transporters – Part 2-2: Safety requirements and test methods for autonomous cargo e-Transporters
40.99 Full report circulated: DIS approved for registration as FDIS
E-Transporters - Part 4-1: Electromagnetic compatibility (EMC) requirements and test methods for e-Transporters – Emission
20.99 WD approved for registration as CD
Interface requirements of autonomous cargo e-Transporters and cloud platform scheduling system
20.99 WD approved for registration as CD
LVDC systems - Part 101: DC power distribution system for typical scenarios
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
IEC TR 63282-103: LVDC systems - Part 103: Flexible interconnection systems with LVDC
30.20 CD study/ballot initiated
IEC TR 63282-104-1: LVDC systems - Part 104-1: Power Quality - Voltage characteristics in public LVDC power supply systems
30.20 CD study/ballot initiated
IEC TR 63282-104-2: LVDC systems - Part 104-2: Power Quality - Voltage characteristics in industrial locations for low-frequency conducted disturbances
30.20 CD study/ballot initiated
Industrial-process measurement, control and automation - Smart manufacturing - Part 2: Use cases
50.60 Close of voting. Proof returned by secretariat
Industrial-process measurement, control and automation – Smart manufacturing – Part 4: Usage of new technologies and standardization
50.00 Final text received or FDIS registered for formal approval
Power Electronic Converters for Distributed Energy Resources - Part 3: Performance and test methods
20.99 WD approved for registration as CD
Semiconductor devices - Generic semiconductor qualification guidelines - Part 3: Guidelines for reliability qualification plans for power semiconductor module
40.99 Full report circulated: DIS approved for registration as FDIS
Semiconductor devices - Guidelines for reliability qualification plans - Part 4: Early failure assessment
40.60 Close of voting