Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Microphysiological System (MPS) and Organ-on-Chip (OoC) systems — Quality control and documentation for cellular components
20.60 Close of comment period
Requirements and recommendations for reefer body and operation
00.00 Proposal for new project received
Digital product passport — Part 1: Overview and fundamental principles
10.99 New project approved
Guidance for the integration of sustainability within an asset management system
30.60 Close of voting/ comment period
Road vehicles — Retrospective safety performance assessment for Automated Driving Systems
20.00 New project registered in TC/SC work programme
Target Differential Pressure Fuel Water Separation Loading
00.00 Proposal for new project received
Fine bubble technology — Evaluation method for determining the shear viscosity of ultrafine bubble dispersions
50.00 Final text received or FDIS registered for formal approval
Ageing societies — Framework for smart multigenerational neighbourhoods — Part 1: Requirements and recommendations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ageing Societies — Part 2: Framework for Smart Multigenerational Neighbourhoods — Part 2: Practical Guidance
20.00 New project registered in TC/SC work programme
Ageing Societies — Part 3: Framework for Smart Multigenerational Neighbourhoods — Part 3: Evaluation and Best Practice
20.00 New project registered in TC/SC work programme
Ageing societies-Guidelines for promoting wellbeing in communities — Part 2: Examples of practices for promoting wellbeing in communities
20.60 Close of comment period
Ageing societies — Ageing-inclusive digital economy — Part 2: Part 2: Checklist
10.60 Close of voting
Fine bubble technology — Domestic applications — Part 2: Technical specification of fine bubble properties for showerheads and faucets
00.00 Proposal for new project received
Mechanical products design optimization and documentation — Part 1: Framework
30.20 CD study/ballot initiated
Ergonomics — Process for the integration of wearable physical assistive devices (exoskeletons) — Expression of needs selection, design, assessment and deployment
30.20 CD study/ballot initiated
Petroleum and related products-Determination of the ignition quality of diesel fuels — Air flow regulation method
40.00 DIS registered
Oil and gas industries including lower carbon energy — Composite coiled tubing with embedded cables
30.00 Committee draft (CD) registered