Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Oil and gas industries including lower carbon energy — Standard for surface preparation and protective coating
00.00 Proposal for new project received
Adventure tourism — Aerial adventure courses — Operational requirements and recommendations
10.99 New project approved
Microfluidic devices – Indicators for material selection used for microfluidic devices
00.00 Proposal for new project received
Requirements for assemblage of a microfluidic system or platform
00.00 Proposal for new project received
Ships and marine technology — Independent type C pressurized liquid ammonia fuel tanks — Inspection and test procedures
00.60 Close of review
Laser surface treatment and related coatings — Terminology, Classification
30.60 Close of voting/ comment period
Fire threat to people — Estimation of toxic gas emissions in building fires
20.00 New project registered in TC/SC work programme
Electronic fee collection – Image-based tolling systems – Test suite structure and test purposes
00.00 Proposal for new project received
Mechanical vibration - Combined effects of head- and body-worn equipment, posture, and whole-body vibration
00.00 Proposal for new project received
Traditional Chinese medicine — Magnolia officinalis and Magnolia officinalis var. biloba bark
30.60 Close of voting/ comment period
Traditional Chinese medicine — Fritillaria cirrhosa, Fritillaria unibracteata, Fritillaria przewalskii, Fritillaria delavayi, Fritillaria taipaiensis, and Fritillaria unibracteata var. wabuensis Bulb
30.60 Close of voting/ comment period
Supply chain interoperability and integration — Part 1: Overview and principles of the industrial internet
40.60 Close of voting
Supply chain interoperability and integration — Part 100: Verification of supply chain data
40.60 Close of voting
Supply chain interoperability and integration — Part 110: Verification of certificates in the supply chain
40.60 Close of voting
Supply chain interoperability and integration — Part 120: Verification of data in support of local purchasing
40.60 Close of voting
Supply chain interoperability and integration — Part 2: Vocabulary
40.60 Close of voting