Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Ships and marine technology — Maritime searchlights — Part 2: Firefighting Light
20.00 New project registered in TC/SC work programme
Ships and marine technology — Maritime searchlights — Part 3: Searchlight for Suez Canal transit
10.20 New project ballot initiated
Ships and marine technology — Maritime searchlights — Part 4: Searchlight for lifeboat and rescue boats
20.00 New project registered in TC/SC work programme
Optics and photonics — Measurement method of propagation loss in passive optical waveguides and components
00.00 Proposal for new project received
Traditional Chinese medicine — Forsythia suspensa fruit
30.00 Committee draft (CD) registered
Sterilization of health care products — Test procedure for measurement of temperature, pressure, and humidity in equipment
20.00 New project registered in TC/SC work programme
Sterilization of health care products — Moist heat — Guidance for verification of a process challenge device (PCD) to a specific load configuration
20.00 New project registered in TC/SC work programme
Metallic materials — Instrumented indentation test for hardness and materials parameters — Instrumented indentation test at elevated temperature with passive tip heating and without tip temperature sensor
10.20 New project ballot initiated
Guidelines for the reuse of water derived from permeable pavement
10.60 Close of voting
Microphysiological systems and Organ-on-Chip — Vocabulary
30.92 CD referred back to Working Group
Sound Power Level and Sound Pressure Level Directivity Measurement of UAS
10.20 New project ballot initiated
Nuclear criticality safety – Validation of k-effective computational methods
00.00 Proposal for new project received
Corrosion control engineering life cycle — Corrosion sources
30.60 Close of voting/ comment period
Steel-plastic Composite Corrosion-resistant Pipeline Installations Engineering Life Cycle- General Requirements
00.60 Close of review
Mercury vapour leakage from pre-capsulated dental amalgam capsules
00.60 Close of review
Transport packaging — Reusable, passive temperature-controlled packaging
20.60 Close of comment period