Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Evaluation of electromagnetic fields around power transformers
40.20 DIS ballot initiated: 12 weeks
Central power supply systems
40.20 DIS ballot initiated: 12 weeks
Wind turbines - Protective measures - Requirements for design, operation and maintenance
40.20 DIS ballot initiated: 12 weeks
Live working - Minimum requirements for the utilization of tools, devices and equipment
40.20 DIS ballot initiated: 12 weeks
High-voltage switchgear and controlgear - Part 205: Compact switchgear assemblies for rated voltages above 52 kV
40.20 DIS ballot initiated: 12 weeks
Hydrogen generators using water electrolysis - Part 1: Safety (ISO 22734-1:2025)
40.20 DIS ballot initiated: 12 weeks
Hydrogen in energy systems - Vocabulary (ISO 24078:2025)
40.20 DIS ballot initiated: 12 weeks
Electrical insulating protective clothing for low-voltage installations
40.20 DIS ballot initiated: 12 weeks
Rotating electrical machines - Part 15: Impulse voltage withstand levels of form-wound stator coils for rotating a.c. machines
40.20 DIS ballot initiated: 12 weeks
Dimensions and output series for rotating electrical machines - Part 2: Frame numbers 355 to 1 000 and flange numbers 1 180 to 2 360
40.20 DIS ballot initiated: 12 weeks
Power transformers - Part 57-1202: Liquid immersed phase-shifting transformers
40.20 DIS ballot initiated: 12 weeks
Power transformers - Part 57-1202: Liquid immersed phase-shifting transformers
40.20 DIS ballot initiated: 12 weeks
Primary batteries - Part 4: Safety of lithium batteries
40.20 DIS ballot initiated: 12 weeks
Electrical installations in ships - Part 301: Equipment - Generators and motors
40.20 DIS ballot initiated: 12 weeks
Electrical installations in ships - Part 302-2: Low voltage switchgear and controlgear assemblies - Marine power
40.20 DIS ballot initiated: 12 weeks
Electrical installations in ships - Part 303: Equipment - Power transformers and reactors
40.20 DIS ballot initiated: 12 weeks