DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00 Proposal for new project received

TC 88 more

Grid Connection Requirements for Converter-Based Resources Interconnecting with Bulk Power Systems

10.20 New project ballot initiated

TC 8/SC 8A more

Grid-forming technology and applications in renewable energy dominated power systems

00.00 Proposal for new project received

TC 8/SC 8A more

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C more

Business Use Cases (BUCs) of Flexibility Services

10.60 Close of voting

TC 8/SC 8C more

Guidelines for assessment of power system resilience

00.99 Approval to ballot proposal for new project

TC 8/SC 8C more

Technical Specification for Automatic Voltage Control of Power System with Integration of lBR (Inverter based Resource)

10.20 New project ballot initiated

TC 8/SC 8C more

Technical Specification for System Restoration of Interconnected Power Systems Using VSC-HVDC

10.20 New project ballot initiated

TC 8/SC 8C more

Railway Applications – Requirements for software development

10.60 Close of voting

TC 9 more

Railway applications - Safety protocols for signaling applications - Part 1: Generic aspects of safety related transmission protocols

10.20 New project ballot initiated

TC 9 more

Railway applicatios - Safety protocols for signaling applications - Part 3: PVS: Safety related transmission protocol for application between ground systems

10.20 New project ballot initiated

TC 9 more

Railway applications - Safety protocols for signaling applications - Part 4: Rail Safe Transport Application Protocol

10.20 New project ballot initiated

TC 9 more

Railway applications – Fixed installations – Lightning protection principles for overhead contact lines systems

10.20 New project ballot initiated

TC 9 more

Railway Applications – Urban Guided Transport Management And Command/Control Systems – Part 4: Interface specifications

10.20 New project ballot initiated

TC 9 more

Standardization of Heat-Loss Measurement of ancillary systems to maintain the superconducting state, such as thermal insulation pipe and/or cryostat for superconducting cables and current leads

00.00 Proposal for new project received

TC 90 more

Materials for printed boards and other interconnecting structures - Part 2-XX: Reinforced base materials clad and unclad – Non-halogenated epoxide modified bismaleimide/triazine with filler woven glass laminate sheets of low thermal expansion and flammability (vertical burning test), copper-clad for IC substrate

10.60 Close of voting

TC 91 more

Materials for circuit boards and other interconnecting structures - Part 3-X: Sectional specification set for unreinforced base materials, clad and unclad - Build-up film of defined dissipation factor (greater than 0,0030 and equal to or less than 0,0050 at 10 GHz) for rigid organic package substrate, unclad

10.60 Close of voting

TC 91 more

Test method for electrical materials, circuit board and other interconnection structures and assemblies - Part 2-X: Test methods for interconnection structures - Test methods for relative permeability and magnetic loss tangent of magnetic dielectric materials for circuit boards at 1 MHz to 1 GHz using impedance analyzer

10.60 Close of voting

TC 91 more