Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Preparation of instructions for use — Structuring, content and presentation — Part 4: Digital Interactive Fault Diagnosis Manual
20.00 New project registered in TC/SC work programme
Material declaration – Part 1: General requirements
60.00 Standard under publication
Statistical method for verification of measurement performance
10.20 New project ballot initiated
Information technology - Brain-computer Interfaces - Vocabulary
50.00 Final text received or FDIS registered for formal approval
Optical fibre cables - Part 8: Optical fibre cables for use in automotive applications - Sectional specification
10.60 Close of voting
Optical fibre cables – Part 1-32: Generic specification – Optical cable elements – Buffered optical fibre
10.60 Close of voting
FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – FIBRE OPTIC CONNECTOR INTERFACES – Part 35: Type LSHE connector series for harsh environments
00.99 Approval to ballot proposal for new project
Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components
00.99 Approval to ballot proposal for new project
Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-XX: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications
10.20 New project ballot initiated
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
10.20 New project ballot initiated
Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield
10.60 Close of voting
Design requirements for Wind Turbine Generators
10.20 New project ballot initiated
Generic EMT Simulation Models of Converter-based Power Plants for Power System Dynamic Analysis
00.99 Approval to ballot proposal for new project
Roadmap of grid integration of renewable energy generation
00.00 Proposal for new project received
General requirements for grid-forming control of renewable energy
00.00 Proposal for new project received